NYC-WTC_000342403
Field inspection report for concrete at WTC paving project (August 2002).
2 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗Concrete test documentation for WTC paving with strength data.
NYC-WTC_000278487OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
MUNICIPAL TESTING LABORATORY, INC. 102 NEW SOUTH ROAD, HICKSVILLE, NEW YORK 11801, 516-938-7120, 516 938-5107 FAX CONCRETE REPORT ^■ent: LIRO Group/NYC DDC Attn; Mike Bailey Report Date: 8/26/02 Address: Six Aerial Way Report Number: DI 018 Lab#: 1404 Syosset, NY 11791 Date Cast: 5/6/02 Project: WTC Paving Project Contractor; Tully/Grace JV Concrete Plant: N/A Strength PSI: 3500 Yards Placed: = FIELD INSPECTION REPORT
Pour Location for Set # 1: Going South on West Broadway, all raised heads, from Franklin St.-South on Broadway Pour Location for Set # 2: Pour Location for Set # 3: Tests made in accordance with ASTM: Yes Not Known Field Inspector (s) ; Client ASTM C 39 COMPRESSIVE STRENGTH TESTS =s=ss =ss3==s==s=s=s=s=s=s=:=s=ss= AREA: 28.27 Cylinder Dia: 6" Cylinder Date Date Slump Air Unit Wt. Temp F. I Truck I Tested Load strength Required Type ID # Cast Tested C143 ;173, C23 C138 C1064 I NO. I Age KN PSI Strength Frac Cylinder Set # 1 6A 5/6/02 5/15/02 3.0 9 822.2 6,540 3,500 A 6B 5/6/02 5/15/02 3.0 9 836.7 6,650 3,500 A 6C 5/6/02 5/15/02 3.0 9 846.5 6,730 3,500 A
Cylinder Set # 2
Cylinder Set # 3
Remarks:
Reviewed By: Laboratory Director Richard Kasparian, P.E conducted tn accordance with ASTM C-39 or AASHTO T-22, By tecfinicians certified by ACI. Municipal Testing is inspected by the Cement and Concrete Reference Laboratory of The National institute of
Su-Mjards and Technology and Is Accredited by: AASHTO and is Licensed by: New York City (#19) and by The State of Florida. 'This report relates only to the item or exact location/ltem tested,
not to the entire construction. It can only be reproduced in tuK. and only wim Municipal Testing taboralory. inc. written permission. Our SaWIrty is strictly limited to the fee paid.
CITY_21MC1OO_OO4662536
NYC-WTC_000278487
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000342403
Field inspection report for concrete at WTC paving project (August 2002).
2 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278491
Concrete test results and field inspection notes for WTC project.
3 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290439
Field inspection report for concrete elements on W.T.C. project; May 2002.
3 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290437
Concrete test report for WTC paving; strength and set information; May–June 2002.
3 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342406
Field inspection report for concrete at WTC paving project (June 2002).
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290444
Inspection notes for concrete on WTC project; curb and hydrant area; June 2002.
3 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000188038
Field inspection report documenting concrete compressive strength testing results.
3 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356586
Concrete field inspection report for LIRO Group/NYC DDC – WTC A2/A3, August 2002.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278481
Field inspection notes and concrete test details for WTC paving project.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342398
Field inspection report for concrete at WTC paving project (May 2002).
3 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290445
Field inspection for WTC concrete; S/W/C locations; June 2002.
3 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278483
Field inspection document for concrete strength and pour details.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000342403
Field inspection report for concrete at WTC paving project (August 2002).
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278491
Concrete test results and field inspection notes for WTC project.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290439
Field inspection report for concrete elements on W.T.C. project; May 2002.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290437
Concrete test report for WTC paving; strength and set information; May–June 2002.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290444
Inspection notes for concrete on WTC project; curb and hydrant area; June 2002.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000188038
Field inspection report documenting concrete compressive strength testing results.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000342403
Field inspection report for concrete at WTC paving project (August 2002).
Similar indexed content
NYC-WTC_000278491
Concrete test results and field inspection notes for WTC project.
Similar indexed content
NYC-WTC_000290439
Field inspection report for concrete elements on W.T.C. project; May 2002.
Similar indexed content
NYC-WTC_000290437
Concrete test report for WTC paving; strength and set information; May–June 2002.
Similar indexed content
NYC-WTC_000342406
Field inspection report for concrete at WTC paving project (June 2002).
Similar indexed content