NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 414 pages

Ground Zero environmental health schools report

Machine-extracted title · confidence 45%

Document discussing lessons learned in children's environmental health related to Ground Zero sites.

NYC-WTC_000276036–000276449
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Cosentini Associates Consulting Engineers

RECOMMENDATION

The Board of Education must insure that all air-handling units and ductwork at Stuyvesant High School are properly cleaned and that highest efficiency filters possible are installed in all ventilation units.

Option 3, Modification of the two existing corridor Air Conditioning systems and providing a new supplemental corridor system, to assure proper air balance (the building should be positively pressurized to the outside) will provide positive results in the minimum time frame.

The system modification will include upgrading of the filtration system to a minimum 90/95% efficiency and extending the existing corridor system ductwork by directly connecting the distribution ductwork into'each classroom. A new supplemental corridor system must then be developed to supply air required in the corridor to assure a proper air balance.

At the request of the Parents Association, use of HEPA filters will be considered.

Employment of a “Design-Build” contractor will accomplish the work described in the minimum time. Preparation of a Scope of Work in conjunction with the contractor can permit construction to start on March 29'*' and be substantially completed June IS*'’’ Installing contractor’s punch list completion and closeout will occur after this time. The time schedule may be affected by time required to assemble the design team, coordinate the work with the Board of Education, and the accessibility of the construction area to the installing contractor. If the school can be temporarily vacated and construction work is performed around the clock 7 days a week, the scheduled time can be reduced substantially.

BUDGET

The budget for the conceptual design for this project, including fees and construction management, is $1,650,000 per the attached estimate of costs. It must be recognized that a firm design has not been established and that this budget will require verification after the preliminary design is developed.

(X:\WP\FILES\2881.02\Jan 24 2002 lAQ Improvement report3.doc)

CITY_21MC100_012173022

NYC-WTC_000276177

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000276177Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000106411 · Box DEP Box 37

Union memorandum regarding environmental monitoring and cleanup protocols following the closure of Stuyvesant High School after the September 11 attacks.

Similar indexed content

NYC-WTC_000149798 · Box DEP Box 10

Generic form or header page from the Department of Environmental Protection regarding general World Trade Center notices and requests.

Similar indexed content

Compare copies and versions →