Daily work force report, World Trade Center, Dec 11, 2001

Machine-extracted title · confidence 28%

Nightly daily work force report for World Trade Center at 8 PM, Dec 11, 2001.

NYC-WTC_000267221
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 6th Road. Whitestone. NY 11357-(718) 7e 7-9000 DATE DECEMBER 11, 2001 (NIGHT FINAL) I 8PM daily work FORCE REPORT

Job Name & Location; World Trade Center Contract No. 1 Weather Conditions CLEAR & MILD _ L I

Labor CLASSIFICATION 4 QUANT T Equipment Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 17 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 7 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS Zt/ MECHANICS TRUCK 1 1 MECHANICS 1 TOOL TRUCK 1 HOUSE WRECKERS 12 TOOL VAN ROLL OFF DUMP TRAILERS PROVIDED TRUCKING FOR ALL CONTRACTORS ON SITE LOW BED TRAILER TULLY HAD SOME FLATS AND EUKES j HIGH DECK TRAILERS WELDING TRUCK 1200/750/375 DOWN BELOW LOADING OUT DEBRIS FUEL TRUCK 1 AND STEEL - LOADED OUR TRAILERSAND TULLYS PICKUP TRUCKS 3 TRAILERS AND EUKES ; LIGHT TOWERS 13 SITE MULE 3 550 ON TOP LOADING OUR TRUCKS i DUMP TRUCKS WORKED IN PIPE CHAMBER NORTH OF NORTH 10 WHEEL DUMP TRUCK ROJECTION PLACED MATS AND MILLINGS FLASHING ARROW BOARD 1 USED 446 OFFICE TRAILER/GENER 1 CARGO BOXES 3 DELAV^__________________________ ;______ FLAT TRUCK 1 1200 DOWN FROM 11.45 TO 1 15 - RECOVERY PUMP 2 375 DOWN FROM 10 00 TO 10.30 - RECOVERY ROLLER 1 RAINMAKER/GENIE LIFT 1

Description of Work-_________________ ________ WORK COMPLETED LOAD OUT STEEL AND DEBRIS ;________ 35 GRACE AREA MAN TARPING AND TRIMMING STATIONS 34 EUKES MAN WATER STATIONS FOR DUST CONTROL 31 FLATS - DOWNSTAIRS MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA 105 AMEC AREA CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 INSTALLATION OF GPS SYSTEMS ,__________________________________ 'elevations all MACHINES LEVEL B-5 253

GRACE CONTRACTING CORP Approved By. Title For SUPERINTENDENT I

DAILY WORK FORCE REPORT 121_1N xIs

CITY_21MC100_004579869

NYC-WTC_000267221

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000267221Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →