NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premises; Inspection Date;
130 Liberty Street 02/28/09
Floor Zip Borough Block Lot Squad # Badge #A011
Various 10006 1 54 1 1
Inspector Building Type Basis of Inspection Photos Taken
N. Patel A TRU2068MN08 Yes
Contractor’s Name Sample Number
LVI Environmental
Address City Sample Number
462 Getty Avenue Clifton
State Zip Phone Sample Number
NJ 07011 (973) 772-3660
Laboratory Name Owner’s Name
TRC Environmental corp. The Lower Manhattan Development Corp.
Address City Address City
1430 Broadway New York One Liberty Plaza New York
State Zip Phone State Zip Phone
NY 10018 NY 10006 (212) 962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr. Proj. Mgr /TRC Environmental 8:25 am - 9:15 am (2"^, S"* & 1"’ floor) and 1:40
pm-2:30 pm (3^^ 2"^ & 1°'floor).
Inspection#!
Onthe/^floor, I entered to the work area from south side with PPE and met Mr. Jose Jimenez, supervisor.
There were 56 people working on the floor. They were demolishing ceiling and walls, spraying amended water
on the debris and boxing it, erecting platform at various locations, clear off floor, cutting metals with HEPA
attached to the power tool, preparing Gaylord boxes and in the decon unit. Four Gaylord boxes and numerous
poly wrapped beams piled on the floor ready to be load out. Negative Air pressure was -0.010.1 took photo of
manometer reading and told LVI personal. I used stair B to go to 3'‘' floor.
On the 3^'' floor, I met Mr. Geraldo, supervisor. There were 48 workers working on the floor. They were
demolishing walls and shaft area, spraying amended water on the debris and boxing it, erecting temp platform in
the shaft, cutting metals with HEPA attached to the power tool, preparing Gaylord boxes and clear off floor.
Seven Gaylord boxes and poly wrapped beams were on the floor to be load out. Two (2) Bulbs cages were
opened. 1 took photos and told supervisor to fix it. I used stair B to go to P' floor.
On the P‘ floor, I met Mr. Angel Moya, foreman. There were 62 workers working on the floor. They were
demolishing walls and ceilings, cutting ducts and metals into pieces with HEPA vacuum attached, spraying
amended water on the debris and boxing it, clear off floor and preparing Gaylord boxes. Six Gaylord boxes were
on the floor ready to be load out. I used stair B to go back to 2"'* floor, proceeds to decon and showers out.
Inspection#?
On the 3'“ floor, I entered to the work area from north side with PPE. There were 48 people working same kind
of works as above. Eleven (11) Gaylord boxes and numbers of poly wrapped beams were on the floor ready to
be load out. Negative Air pressure was -0.089.1 used stair B to go to 2"“ floor.
On the 2"‘* floor, I met Mr. Jose Jimenez, supervisor. There were 56 people working same kind of work as
above. Six Gaylord boxes and numerous poly wrapped beams were on the floor ready to be load out. I used stair
B to go to P'floor.
On the P' floor, There were 62 workers were performing the same tasks as above. Seven Gaylord boxes were on
the floor ready to be load out. 1 used stair B to go back to 3'‘* floor, proceeded to the decontamination system,
decontaminated myself, signed the log book and exited out. Negative pressure on 1" floor was -0.014. My
observations were discussed with TRC, LVI and ATC personals.
NOV#
RESULT CODE; 2
‘NOV#’
NOV# SUPERVISOR
Borough l=Manhatian 2=Bronx 3=Brooklyn 4=Queens 5=Richmond
Building Type A >6 siories B <6 stories C single family D school E hospital F public owned
Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=Public Owned Property
CITY_DEP_WORBY_CANNATA_SUBP_000131249
NYC-WTC_000266080