Asbestos inspection, 130 Liberty Street, Jul 2009

Machine-extracted title · confidence 43%

Asbestos inspection record for 130 Liberty Street with contractor details and photos.

NYC-WTC_000266047
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 07/20/09 Floor Zip Borough Block Lot Squad # Badge # Various TiTiTiT6 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze F TRU2068MN08 yes Contractor’s Name Sample Number LVI Environmental Address City Sample Number 462 Getty Avenue Clifton State Zip Phone Sample Number NJ 07011 973-772-3660 Third Party Air Monitor Owner's Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 212-221-7822 NY 1 BBBt6 (212)962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj. Mgr/TRC Environmental 1:10 pm to 2:20 pm

I arrived at the premise at 1:10 pm. LVI schedule informed that activities include: exterior fagade removal, prep. North exterior column tents on 3'“ floor; abate columns at West Atrium on 2™‘floor; break down work area on T' floor; demo ducts and conduits, scrape fireproofing, box out debris in basement. I proceeded to the west site decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area in the basement. Two Workers were present for the decon maintenance, cleaning the clean room and organizing shower room. Negative air pressure on the floor was -0.059.

Basement - 35 Asbestos Handlers were present inside the work area. Workers inside the electrical room #2 and pump room were cutting and removing conduits, using power tools with HEPA vacuum attached. At the extended area of electrical room #1 workers were scraping fireproofing, spraying with amended water, cleaning the floor from ceiling cleaning, placing debris into the boxes. Inside the electrical room fireproofing removal was completed and handlers were washing the walls, floor, ceilings, pieces of scaffolds; at the end of the hallway workers were demolishing the part of cinder wall to gain access to the column; spraying the area with amended water. Other workers were placing debris into the boxes; preparing and loading out boxes through the waste decon. 15 Gaylord boxes were on the floor ready for load out. Inspection was done on micro trap machines and tents. After following the decontamination procedure I exited the work area. Using the stairs on the west side of the building I proceeded to the 1“floor. 1” Floor - No activities or personnel observed on the floor. Using stairwell I proceeded to the 2"‘‘floor. 2"'' Floor - Column at West Atrium was abated, 9 workers were inside the containment cleaning the column. 8 Gaylord boxes were on the floor ready for load out. Using stairs I proceeded to the 6'^ floor remote decon, suit up, don respirator, signed the log book and went to the 3"“ floor containment. 3'** Floor -At the north/west side area two tents were set up around the columns 2 and 3, 9 workers were inside the containment checking criticals, micro tarp machines. Two micro traps were powered on and 1 on stand by inside each tent. Tents of each column were sealed well all way down to the 2"'^ floor. Handler Foreman Rick informed me that cleaning of the columns will start tomorrow. At the south side of the building workers were removing glass windows. 12 Eagle scaffolding workers were erecting the scaffold and setting up platforms for fagade work at the east side of the building. 14 Gaylord boxes were on the floor. I went back to the 6"' floor decon, after decontamination procedure I used stairs to return to the ground floor.

Inspection was done on ATC trailer and dumpsters on the south side fenced area. 1 observed that left side dumpster was not covered well with plastic and informed Arnel Javal Sr.Pr.Manager of TRC, who then contacted LVI office. Dumpster was sealed immediately.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2_____________________ NOV# Infraction Infraction Infraction Supervisor’s Initial

Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=PubIic Owned Property

CITY_DEP_WORBY_CANNATA_SUBP_000130989

NYC-WTC_000266047

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000266047Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →