NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Asbestos inspection, 130 Liberty Street, Jul 2009

Machine-extracted title · confidence 43%

Asbestos inspection record for 130 Liberty Street with contractor details and photos.

NYC-WTC_000266044
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 07/17/09 Floor TZip Borough Block Lot Squad # Badge # Various 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze F TRU2068MN08 yes Contractor’s Name Sample Number LVI Environmental Address City Sample Number 462 Getty Avenue Clifton State Zip Phone Sample Number NJ 07011 973-772-3660 Third Party Air Monitor Owner’s Name TRC Environmental Corp. The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 (212) 221-7822 NY 10006 (212)962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj. Mgr/TRC Environmental 7:00 pm to 7:30 pm

On arrival at the premise I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on 1^' floor. Two workers were present for the decon maintenance, cleaning shower chambers and organizing the clean room. Negative air pressure on the floor was -0.033.

LVI schedule activities include: demo ducts and conduits, scrape fireproofing, box out debris - Basement A.

Using the entrance from the first floor I proceeded to the Basement A.

Basement A - 34 Asbestos Handlers were present inside the work area. Workers at the south/east side hallway were breaking down 1 wythe brick to open the cinder wall. Three workers at the east side part of the former electrical utility room were demolishing the cinder blocks to open the columns; demolishing equipment inside the former electrical room using tools with HEPA vacuum attached. Others were spraying the area with amended water, picking up debris, preparing boxes, replacing filters of micro trap machines, wrapping beams with poly. 25 Gaylord boxes were on the floor ready for load out. 15micro trap machines were powered on and 3 on stand by. Using exit I went back to the 1®’ floor decon.

After following the decontamination procedure I exited the work area.

Inspection was done on ATC trailer.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s Initial

Borough l=Manhattaii 2=Broiix 3=Brooklyu 4=Queens 5=Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=Public Owned Property

CITY_DEP_WORBY_CANNATA_SUBP_000130986

NYC-WTC_000266044

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000266044Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →