NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No. Inspection Date:
130 Liberty Street 07/02/09
Floor Zip Borough Block Lot Squad # Badge #
Various 10006 1 54 1 1 A062
Inspector Building Type Basis of Inspection Photos Taken
M.Gagnidze F TRU2068MN08 yes
Contractor’s Name Sample Number
LVI Environmental
Address City Sample Number
462 Getty Avenue Clifton
State Zip Phone Sample Number
NJ 07011 973-772-3660
Third Party Air Monitor Owner’s Name
TRC Environmental Corp The Lower Manhattan Development Corp.
Address City Address City
1340 Broadway New York One Liberty Plaza New York
State Zip Phone State Zip Phone
NY 10018 212-221-7822 NY 10006 (212)962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr. Proj. Mgr/TRC Environmental 10:00 am to 11:15 am
I arrived at the premise at 10:00 am. LVI schedule informed that activities include: exterior fagade removal;
North side tent abatement on 4“’ floor, clear floor, fine clean area, loading out boxes to ATC trailer on 1” floor,
clear floor, box out debris in basement.
I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to
enter the regulated area on V' floor. Three Workers were present for the decon maintenance, cleaning and
organizing the clean room and shower room.
Negative air pressure on the floor was -0.049.
1” Floor - 76 Asbestos Handlers were present inside the work area. Eagle scaffolding workers were erecting
the scaffold and setting up platforms around the engines at the former mechanical room; workers at the area #5
were breaking concrete to clean the edge at the west side shaft area; cutting metal fixtures from the ceiling at
the east shaft using power tool with HEPA vacuum attached; asbestos handlers on scaffolds were at the west
shaft cleaning the walls and scaffolds; other workers vacuuming the floor, cleaning the edges in shaft and
plasticizing, covering pipes with foam, placing debris into the boxes; preparing and loading out boxes through
the waste decon. 65 Gaylord boxes were on the floor ready for load out. 40 micro trap machines were on and 5
on stand by. Inspection was done on micro trap tents.
Using entrance from first floor I proceeded to the basement.
Basement - No activities or personnel observed. 25 sealed boxes were on the floor. 10 micro trap machines
were powered on. Using exit I went back to the 1” floor decon.
After following the decontamination procedure I exited the work area.
I used north side hoist to proceed to the 4*’’ floor.
4*^ Floor - No activities or personal on the floor.
Using stairs I proceeded to the 5"’ floor.
S®" Floor - 22 workers were observed on the floor removing window covers and glass at the east and south
side of the floor; workers wear double suits, PPA and gloves, picking up pieces of metal, placing into the boxes
and spraying with amended water. 5 Gaylord boxes were sprayed and ready to be taken down to the ground
floor.
Using north hoist I returned to the ground floor.
Inspection was done on ATC trailer.
NOV# Infraction Infraction Infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2____________________
NOV# Infraction Infraction Infraction Supervisor’s Initial
Borough l=Manliattan 2=Bronx 3=Brooklyn 4=Queens 5=Rjchmond
Building Type A >6 stories B <6 stories C single family D school E hospital F public owned
Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV)
5=Public Owned Property
CITY_DEP_WORBY_CANNATA_SUBP_000130982
NYC-WTC_000266040
OCR can misread numbers and units. Confirm readings against the page image before using them.