NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No. Inspection Date:
130 Liberty Street 11/18/08
Floor Zip Borough Block Lot Squad # Badge#
Various 10006 1 54 1 1 A062
Inspector Building Type Basis of Inspection Photos Taken
M.Gagnidze F TRU0086MN08 yes
Contractor’s Name Sample Number
LVI Environmental
Address City Sample Number
State Zip Phone Sample Number
Laboratory Name Owner’s Name
TRC Environmental Corp The Lower Manhattan Development Corp.
Address City Address City
1340 Broadway New York One Liberty Plaza New York
State Zip Phone State Zip Phone
NY 10018 NY 10006 (212) 962-2300
Contact Person Time of Inspection from;
Arnel Javal, Sr. Proj. Mgr/TRC Environmental 1:20 pm to 2:25 pm
I arrived at the premise at 1:20 pm. LVI schedule informed that activities include demo shafts,
box debris, scrape fireproofing on 7“’ & 6*'’ floors, scrape fireproofing, box debris on 4"’ floor.
I proceeded to the decon, signed the log book, don appropriate level of personal protective equipment
to enter the regulated area on 6*'’ floor. Negative air pressure on the floor was 0.041.
One worker was present in the airlock, cleaning the floor and re-sealing the perimeter with duct tape.
I used B stairwell to go to floor.
7*'’ Floor - 23 workers were found on the floor. Workers on 5 scaffolds were scraping fireproofing
at the area 6, spraying the area with amended water, picking up debris, placing into the boxes,
cleaning the floor, electricians were cleaning the electrical room.
Other workers were wrapping the hose with insulation and poly, preparing, wrapping
and loading out boxes. 15 Gaylord boxes were ready for load out.
Inspection was done on micro trap machines and tents.
20 micro trap machines were powered on and 5 on stand by.
Using B stairs I proceeded to the 6*' floor.
6*'' Floor - 24 workers were present on the floor. Workers on 4 scaffolds on the west side of the work area
were cleaning the ceiling, spraying with amended water, picking up excess water using wet-dry shop HEPA
vacuum. On the east side, at the area two workers were fine cleaning the ceiling, sweeping an vacuuming
the floor with equipment equipped with HEPA filters, replacing the filters of micro trap machines.
Other workers were cleaning and re-sealing the floors of the critical barriers, wrapping electrical cords
and wires, preparing and wrapping boxes. 5 Gaylord boxes were ready for load out.
Inspection was done on micro trap machines and tents.
I used B stairs to proceed to 4"' floor.
4*" Floor - 27 workers were performing work on the floor, lightly encapsulating the area A,
plasticizing micro traps with poly, wrapping beams in three layers of 6 mil poly sheeting, preparing boxes,
inspecting the critical barriers. 5 Gaylord boxes were ready to be taken out.
20 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents.
I used B stairs to go back to the 6*" floor.
After following the decontamination procedure I signed the log book and used north hoist to return to
the ground floor.
Inspection was done on ATC trailer.
NOV# Infraction Infraction Infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2
NOV# Infraction Infraction Infraction Supervisor’s Initial
Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond
Building Type A >6 stories B <6 stories C single family D school E hospital F public owned
Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV)
5=Public Owned Property
CITY_DEP_WORBY_CANNATA_SUBP_000130880
NYC-WTC_000265990
OCR can misread numbers and units. Confirm readings against the page image before using them.