NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

NYC-WTC_000265968

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000265968
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 01/23/09 Floor Zip Borough Block Lot Squad # Badge # Various 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze F TRU2068MN08 yes Contractor's Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner’s Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212) 962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj. Mgr/TRC Environmental 8:20 pm to 9:40 pm

I arrived at the premise at 8:20 pm. LVI schedule informed that activities include remove walker ducts and raceways south vestibule 11'” floor, box out debris, equipment, etc. on 5"’ floor, demo, box out debris on 3"* and 2'’‘'floors.

I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on 11'’’floor. Negative air pressure on the floor was 0.045. One worker was present for the decon maintenance.

11'" Floor - 5 workers were working on the floor cutting walker ducts, removing metal and cables, picking up debris, placing into the black asbestos waste bags, spraying with amended water. Two micro trap machines were powered on. After following the decontamination procedure I signed the log book and used north hoist to proceed to the 3'''floor I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area. Using B stairwell I went to the 5'” floor. 5'" Floor - 10 workers were present on work site. Workers on platforms at the south/east side of the work area were removing some metal fixtures from the columns, cleaning and plasticizing the platform, fine cleaning the beams, columns, ceiling at the spandular beams, using HEPA vacuum. Two other workers were loading out boxes. Inspection was done on micro trap machines and tents. I used B stairs to proceed to the 3"’ floor. 3"* Floor - 22 workers were working on the floor, removing pipes and metal fixtures from the ceiling at the various locations on the floor, cutting metal with the power tools attached to the HEPA vacuum, picking up debris and placing into the boxes and spraying with amended water, preparing, wrapping and loading out boxes. A large amount of debris exists on the floor. 10 Gaylord boxes were ready for load out. Inspection was done on micro trap machines and tents. I used B stairwell to proceed to the 2'’“ floor. 2'“' Floor - 16 workers were found inside the work place. Workers on scaffolds were removing the metal fixtures from the ceiling, cutting metal into the pieces at the various locations of the floor, picking up debris from the floor, placing into the boxes and spraying. Others were wrapping beams with poly, replacing filters of the micro trap machines, preparing and loading out boxes. Inspection was done on micro trap tents. 20 Gaylord boxes and a large amount of poly wrapped beams were ready to be taken out, I used B stairwell to go back to the 3'" floor.

After following the decontamination procedure I signed the log book and used north hoist to return to the ground floor. Inspection was done on ATC trailer.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2_______________ NOV# Infraction Infraction Infraction Supervisor’s Initial

Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code I = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=Public Owned Property

CITY_DEP_WORBY_CANNATA_SUBP_000130844

NYC-WTC_000265968

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000265968Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →