NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Asbestos inspection, 130 Liberty Street site

Machine-extracted title · confidence 46%

Asbestos inspection at 130 Liberty Street, Sep 2008, LMDC site.

NYC-WTC_000265863
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 09/04/08 Floor Zip Borough Block Lot Squad # Badge # Various 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze F TRU0086MN08 No Contractor’s Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner’s Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212)962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj. Mgr/TRC Environmental 9:55 pm to 11:05 pm

I arrived at the premise at 9:55 pm, LVI informed that scheduled activities include scrape, boxing debris on 12'” floor and interior demolition, cutting metal on 11*” and 10'” floors, loading out boxes to ATC trailer. I entered the decon area, suit up, don respirator and entered containment on 12'” floor. Two workers were cleaning in the decontamination enclosure system.

12'” Floor -20 Workers were cleaning the ceiling in the south side area of the floor, 2 workers were spraying with amended water, another 8 workers on scaffolds on the east side of the area were scraping and cleaning vertical columns and beams. I observed on the west side of the work area that exhaust duct, connected to the micro trap machine, needed to be re-sealed with duct tape. Workers were cleaning the floor and vacuuming up the water from the ceiling cleaning. 22 Gaylord boxes were ready for load out. Inspection was done on micro trap machines and micro trap tents, air monitoring pumps were on. 20 Micro trap machines were powered on and 5 were on stand by.

11'” Floor - 15 Workers were working on the floor. Four workers were found re-sealing the wall on north side of working area. Piles of poly wrapping beams which have been sprayed with amended water were present in various areas of the floor. Two workers were on ladder removing the metal ducts. Eight workers were removing the floor tiles on the south side of the area and another two workers spraying area with amended water. 35 Gaylord boxes were ready to be taken out. Two workers were preparing Gaylord boxes. 20 micro trap machines were powered on and 5 were on stand by. Inspection was done on micro trap tents.

I used B stairwell to proceed to the 10'^ Floor.

10'” Floor - There were 14 workers on the floor in the process of demolishing and wrapping of debris. 2 workers were cutting metal ducts into smaller pieces for load out. Power tools have an operating HEPA vacuum attached during cutting. 2 other workers were removing electrical wires from the ceiling. 12 workers were observed preparing the boxes, wrapping debris and placing into Gaylord boxes. Two workers were spraying with amended water on the Gaylord boxes. 20 micro trap machines were powered on and 5 were ori stand by. Inspection was done on micro trap tents. Filters were dirty and needed to be replaced. 5 Gaylord boxes were on the floor ready to be taken out. I observed that there was water leak from 11'” floor. I contacted foreman of 11'” floor and advised him to keep close watch on the floor.

I used B stairwell to go back to the 12” Floor, proceeded to the decon, showered out and signed the log book.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2_______________ NOV# Infraction Infraction Infraction Supervisor’s Initial

Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5*=Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=Public Owned Property

CITY_DEP_WORBY_CANNATA_SUBP_000130562

NYC-WTC_000265863

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000265863Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →