NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Asbestos inspection photos, 130 Liberty Street, 2008

Machine-extracted title · confidence 27%

Inspection record with photos and ownership details at 130 Liberty Street.

NYC-WTC_000265851
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 10/22/08 Floor Zip Borough Block Lot Squad # Badge # Various 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze F TRU0086MN08 yes Contractor's Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner’s Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212) 962-2300 Contact Person Time of Inspection from; Arnel Javal, Sr. Proj. Mgr/TRC Environmental 1:30 pm to 2;45 pm

I arrived at the premise at 1 ;30 pm. LVI schedule informed that activities include clear off floor, move debris on 10“' floor, cut raceways north side, direct installing fall protection cables on O'" floor, demo, cut raceways, box debris, 8'“ floor demo shaft on S'" & 7“' floors, demo, box debris on 6"’ floor, prep micro trap tents, install traps, wrap cables on S'" floor.

I proceeded to the decon, don the appropriate level of personal protective equipment to enter the regulated area on 8“' floor. One worker was cleaning decon. Negative air pressure on the floor was 0.083. I used B stairs to proceed to the 10“’ floor.

10'^FIoor - 12 workers were found on the floor in the process of moving boxes, cleaning floor from debris, moving carts, lifting up the electrical wires. I observed the hole inside the north side tent. Worker seal it with duct tape immediately. Inspection was done on micro trap machines and micro trap tents. Air monitoring pumps were powered on. I used B stairs to proceed to the 9"’ floor. S'^FIoor - No activities or personnel observed on the floor. 20 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. I used B stairs to proceed to the 8'" Floor. 8'''Floor - 10 workers were working on the floor, cutting raceways on the north side of the work area, using power tools with HEPA vacuum attached during cutting, spraying with amended water, installing fall protection cables and high visibility fence around the shaft area, demolishing the wall in shaft area. A large amount of poly wrapped beams exists on the floor in the various locations; workers were wrapping beams, preparing boxes for debris. 20 Gaylord boxes were ready to be taken out. Inspection was done on micro trap machines and tents. I used B stairwell to proceed to the 7“’ floor. 7*“ Floor - 21 workers were present on the floor. Workers were cutting metal into pieces with electrical tool attached to the HEPA vacuum, placing debris into the boxes and spraying with amended water, preparing boxes for debris, cleaning and plasticizing the floor in the shaft area, re-sealing and lifting up electrical wires. 20 Gaylord boxes were ready for load out. Inspection was done on micro trap machines and tents. I used B stairwell to proceed to the 6"’ floor. 6*“ Floor - 24 workers were working on the floor, inspecting the critical barriers, cutting metal fixtures, covering holes on the floor, loading out boxes through the waste decon, cleaning the floor from debris, sealing the platform inside the shaft area. A lot of debris was in various locations on the floor. 30 Gaylord boxes were ready for load out. Inspection was done on micro trap machines and tents. Using B stairs I proceeded to the 5*" floor. S"" Floor - 12 workers on the floor were ready to set up the negative air machines, connect them to the exhaust ducts, wrap electrical cables with poly. Other workers were plasticizing the floor of the tent. I used B stairs to go to the lO'" floor. After flowing the decontamination procedure I signed the log book and used north hoist to get back to the ground floor. Inspection was done on ATC trailer.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s Initial

Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmord Building Type A >6 stories B <6 stories C single fairiily D school E hospital F public owned Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=Public Owned Property

CITY_DEP_WORBY_CANNATA_SUBP_000130519

NYC-WTC_000265851

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000265851Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →