Day shift workforce and equipment log for Grace Contracting at World Trade Center site, January 2002.
1 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗DAY FINAL daily workforce report for World Trade Center construction (1/31/02).
NYC-WTC_000263649OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 151-45 sth Road. Whitestone. N.Y. 11357-(718) 767-9000 DATE: 1/31/02 DAY FINAL
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions
Labor Equipment CLASSIFICATION QUANT. Description [MANNED STANDBY IDLE SUPERINTENDENT_______________________ 2 CAT 966 LOADER 1 PROJECT ENGINEER 2 CAT 365 GRAPPLER 1 OFFICE ENGINEER CAT 375 GRAPPLER 2 FOREMEN 1 HITACHI 750 GRAPPLER 1 SAFETY OFFICER HITACHI 1200 GRAPPLER 1 LABORERS 12 185 CFM COMPRESSOR 1 IRON WORKERS 235 HAMMER HOE RAM 1 LOCAL 14 5 MECHANICS TRUCK 2 LOCAL 15 5 TOOL TRUCK CARPENTER TOOL VAN 1 CARPENTER FOREMAN 1 ROLL OFF TEAMSTERS (FUEL, TRAILER DELIVERY) 1 DUMP TRAILERS 8 TEAMSTERS (FLATBEDS, DUMPS, AND EUKES) 14 LOW BED TRAILER MECHANICS_____________________________ 2 HIGH DECK TRAILERS 2 HOUSE WRECKERS WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 6 LIGHT TOWERS 5 DELIVERIES: SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD OFFICE TRAILER/GENER. 1 NOTE* TRUCK 63 RAN STONE FOR TULLY OUT OF QUEENS CARGO BOXES 4 USED THE 375 TILL 12:00 PM, THEN SWITCHED TO FLAT TRUCK 1 MAZZOCHLS 550. 1200 DOWN AT 10:30 PUMP 2
LIGHT TOWERS USED FOR 2.5 HOURS
Description of Work: COMPLETED WORK______________________________________________________________ □ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF WTC COMPLEX, MACHINES AT EL. B6 MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA_____________________________________ RECORD TIMES AND NUMBERS OF TRUCK LOADS OF DEBRIS FROM SITE__________________ LOADS OUT:__________________________________________________ YUKES;______________ DOT LOADS:
GRACE CONTRACTING CORP Approved By: BY: Title: For: SUPERINTENDENT
DAILY WORK FORCE REPORT0131D.xls
CONFIDENTIAL, CITY_21MC1OO_O13119678 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008
NYC-WTC_000263649
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000356578
Day shift workforce and equipment log for Grace Contracting at World Trade Center site, January 2002.
1 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429419
Day shift staffing and equipment description for World Trade Center site on 1/31/02.
1 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237690
Day shift final daily work force and equipment log for Grace Contracting Corp. at the World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305187
Day final workforce and equipment at World Trade, Jan 31, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342325
Day shift daily workforce and equipment at World Trade site, January 2002.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429455
Daily workforce roster and equipment listing for World Trade Center construction crew.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305485
Day final daily workforce and equipment at World Trade Center site, jan 30 2002.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291328
Daily staffing and equipment list for World Trade Center site, Feb 5, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305454
Final daily crew and equipment listing for World Trade Center site, Feb 4, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305149
Day shift daily workforce and equipment at World Trade site, Jan 11, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000252305
Night shift daily workforce and equipment roster for World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305122
Daily labor/equipment summary for World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000356578
Day shift workforce and equipment log for Grace Contracting at World Trade Center site, January 2002.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429419
Day shift staffing and equipment description for World Trade Center site on 1/31/02.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237690
Day shift final daily work force and equipment log for Grace Contracting Corp. at the World Trade Center site.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305187
Day final workforce and equipment at World Trade, Jan 31, 2002.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342325
Day shift daily workforce and equipment at World Trade site, January 2002.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429455
Daily workforce roster and equipment listing for World Trade Center construction crew.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000356578
Day shift workforce and equipment log for Grace Contracting at World Trade Center site, January 2002.
Similar indexed content
NYC-WTC_000429419
Day shift staffing and equipment description for World Trade Center site on 1/31/02.
Similar indexed content
NYC-WTC_000237690
Day shift final daily work force and equipment log for Grace Contracting Corp. at the World Trade Center site.
Similar indexed content
NYC-WTC_000305187
Day final workforce and equipment at World Trade, Jan 31, 2002.