NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 428 pages

EPA WTC interim report comments, 2003

Machine-extracted title · confidence 28%

Comments on EPA interim report regarding World Trade Center collapse from 2003.

NYC-WTC_000251148–000251575
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

N: Secret abatement of EPA building in NYC - 242

building would have quickly mixed with other dust on the street and be diluted and undetectable. If asbestos were found in the dust outside on the sidewalks and street as well as the lobby, then it came from the WTC itself not rescue workers.

EPA abated its building based on positive dust tests, but negative air tests, EPA has denied citizens any indoor dust testing during the free cleanup program, saving risks are only related to air measurements, and dust testing is irrelevant.

The only positive tests EPA had for asbestos at 290 Broadway were in the settled dusts, not in the air. The air tests were negative for any asbestos.

EPA has repeatedly claimed that measurements of settled dust were irrelevant to any estimation of risk. Even after intensive lobbying by citizens and scientists, EPA still denied citizens the right to test settled dusts on surfaces in their apartments during EPA’s volimtary residential cleanup program. EPA will only test for asbestos in the air.

In complete contradiction, at its own building, EPA had surface dust testing as well as air test. They gave greater credence to the results of the dust tests than the air tests. It was on the basis of the dust tests, not air tests, that EPA abated its building.

EPA used a more sophisticated test method for dusts at their building, electron microscopy, EPA denied this testing for the rest of Manhattan, even when it was offered for free.

Furthermore, EPA used a more sophisticated test method for the dusts at their building (both inside and out). EPA used transmission electron microscopy (TEM) for the dusts. EPA only offered the antiquated light microscope testing (PLM) for outdoor dusts for the rest of Manhattan. (EPA did test outdoor dust, but not indoor dusts.) The sophisticated TEM tests at the EPA building were positive, but the PLM tests were negative.

On the basis of positive results from a test denied to the rest of Manhattan, EPA abated its own building. The test EPA used for the rest of Manhattan, PLM, was negative for the EPA building.

Section L discussed how EPA Region 2 even refused the offer of free TEM dust testing capabilities from Region 8 on 9/12/01, just two days before the exact same test for dusts was used at its own building. Region 2 insisted on using only PLM testing for asbestos for the rest of Manhattan, which uniformly gave false negative results. Even for its own building at 290 Broadway, PLM testing of dusts gave negative results.

NYC-WTC_000251398

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000251398Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →