NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 33 pages

Disaster 1391 project, NY, Mar 2003

Machine-extracted title · confidence 25%

Expense and applicant details for NYC/Design and Construction related to disaster project.

NYC-WTC_000251095–000251127
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Date: 03/31/2003 FEDERAL EMERGENCY MANAGEMENT AGENCY Project Completion and Certification Report (P.4) Disaster 1391

P.A. ID: 061-51000-19 Applicant: NEW YORK / DESIGN AND CONSTRUCTION, DEPARTMENT OF PW# VSN PKG# INF Cat Work Projected Approved PW % Actual Date Amt. Claimed Comments Done By Compl. Date Amt. Compl. Completed by Applicant at Ingp ____________ _ ________________ S REMOVAL ACTIVITIES A PORTION OF THE ESTIMATE INCLUDES POTENTIAL COSTS THAT MAY BE APPROVED BY DDC AFTER THE RESOLUTION OF A NUMBER OF DISPUTES WITH SUBCONTRACTORS REGARDING DDC'S DEBRIS REMOVAL PROJECT POLICIES. THESE DISPUTES ARE BEING HANDLED BY DDC IN ACCORDANCE WITH THE CITY'S NORMAL PROCEDURES FOR DISPUTE RESOLUTION (SEE ATTACHMENT DESCRIBING PROCESS).

11 SHOULD BE NOTED THAT THE REQUISITIONS SUBMITTED BY BOVIS/AMEC AND INVOICES SUBMITTED BY ITS SUBCONTRACTORS AND SUBCONSULTANTS INCLUDE COSTS FOR WORK PERFORMED DURING BOTH PHASE 1 AND PHASE 2. ORIGINALLY SEPARATE PWS WERE PREPARED TO FUND THE COSTS ASSOCIATED WITH BOVIS' PHASE 1 ACTIVITIES AND BOVIS/AMEC PHASE ? ACTIVITIES. HOWEVER, BECAUSE PHASE 1 AND PHASE 2 COSTS WERE NOT SEPARATED IN THE REQUISITIONS, THE PWS PREPARED FOR DEBRIS REMOVAL PERFORMED UNDER THE BOVIS AND BOVIS/AMEC AGREEMENTS DURING BOTH PHASES (TO INCLUDE PWS 92, 766, 870, 1086, AND 1090) SHOULD BE TREATED AS ONE PROJECT FOR CLOSE-OI IT PURPOSES (AMEC HAS SUBMITTED SEPARATE REQUISITIONS FOR ITS PHASE 1 ACTIVITIES.)

SINCE THE COMPLETION OF THE DEBRIS REMOVAL ACTIVITIES, DDC HAS BEEN INVESTIGATING ALTERNATIVES FOR THE DISPOSITION OF THE EQUIPMENT THAT THEY PURCHASED THROUGH THEIR CONSTRUCTION MANAGEMENT AGREEMENTS THEY HAVE DETERMINED THAT THERE ARE POTENTIAL LIABILITY ISSUES REGARDING THE ABILITY TO FULLY DECONTAMINATE THE EQUIPMENT IN ORDER IO THEN SELL THE EQUIPMENT (SEE ATTACHED MEMO FROM ROBERT ADAMS, DIRECTOR- ENVIRONMENTAL HEALTH AND SAFETY SERVICES FOR DISCUSSION OF THE ISSUES). BASED ON THE LIABILITY ISSUES DDC CONTENDS THAT IT IS NOT PRACTICAL TO CONSIDER SELLING THE EQUIPMENT OR EVEN RE-USING THE EQUIPMENT THEMSELVES. ACCORDINGLY, DDC HAS REQUESTED, AND FEMA HAS AGREED, THAT THE RESIDUAL VALUE OF ALL EQUIPMENT PURCHASED AND USED DURING THE DEBRIS REMOVAL OPERATIONS BE CONSIDERED AS ZERO.

ALL PHYSICAL DEBRIS REMOVAL ACTIVITIES ARE 100% COMPLETE. ALL REMAINING WORK TO BE COMPLETED IS ASSOCIATED WITH CONTRACT CLOSE OUT WHICH IS ESTIMATED TO COMPLETED FOR THE MOST PART BY THE END OF MARCH 2003. WORK ASSOCIATED WITH THE dispute RESOLUTION DISCUSSED ABOVE IS EXPECTED TO CONTINUE THROUGH THE END OF JUNE 2003.

Page 19 of 311

NYC-WTC_000251115

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000251115Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →