From: Lonergan James
Sent: Wednesday, December 05, 2001 9:07 AM
To: Nappi Joseph
Cc: LEMPERT ALEX
Subject: FW: 90 TRINITY PLACE - FANS
fyi
j™
-—Original Messagi
From: Varkey George
Sent: Tuesday, December 04, 2001 5:07 PM
To: Lozzano Wiliiam
Cc: O'Connell John; Lonergan James
Subject: RE; 90 TRINITY PLACE - FANS
Jim:
Fans are running . Honeywell ran them on manual. They will be back again tomorrow. Custodian will coordinate with
SCA for air sampling etc
George Varkey
—Original Message.
From: Lozzano William
Sent: Tuesday, December 04, 2001 4:34 PM
To: Varkey George
Cc: O'Connell John; Lonergan James
Subject: 90 TRINITY PLACE - FANS
STATUS
After field survey, the fans were ready to run in manual since last Friday 11/30/01, the fireman
requested as a personal preference to run the fans with DDC controls and requested to SCA project
manager to inform BOE that fans will not work if DDC is not up and running.
Inspector and Honeywell will monitor and verify fan performance. As of 12/5/01 the motors will be
under normal operating DDC control - Honeywell. The total contact points are 6 only.
The air test can be taken after all diffusers and air intakes are cleaned and/ or removed.
Other concerns:
Debris adjacent to air intakes needs to be removed. 'A >'
Dampers need to be connected and re-installed in several locations.
Cooling tower sludge needs to be removed and system flushed before running the equipment.
Project in progress:
Small cooling tower for gym. clean up is in progress under contract maintenance, project started
before incident.
1'> 7 01 the motors Vvb;
6 only.
CITY_21 MC100_014598715