NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 35 pages

Environmental assessment NYC Law Dept, Apr 2002

Machine-extracted title · confidence 37%

EIA report for Law Department project at 100 Church Street by TRC.

NYC-WTC_000243565–000243599
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

space above the suspended ceiling which acts as a return air plenum. Air then travels into the return air risers and returns to the 7^’’ floor fan room

The perimeter induction units, visible as units under the windows, are supplied through a supply fan located on the 7* floor. The perimeter air handler forces air through risers running along perimeter columns. The supply risers are connected to circular ducts connected to the perimeter induction units on every floor. The return air from the perimeter units mixes with the supply air on the floors and returns via interior system return air risers. There is no dedicated return air fan for the perimeter air supply system.

In addition to the air supply from the main building HVAC system located on the 7**’ floor, supplemental air handling units have been installed in various locations to provide additional cooling. These vary from floor to floor generally re-circulating the building air from above the suspended ceiling through a cooling coil.

An inspection of the air handlers and ductwork indicated that visible accumulation of dust/debris was present. Although the air handlers appeared to have been partially cleaned and there was no -gross debris observed which could be obviously associated with the WTC collapse, visible dust was noted. The inspection of ductwork revealed the presence of significant accumulations of dust and debris, which would not have been expected subsequent to a duct cleaning effort.

At the time of the inspection, the building had upgraded the filtering system to include high efficiency filters for particulate control. These high efficiency filters replaced the normal bag filtering system and significantly increased the filtering capability of the system that provides conditioned air to the NYCLD space.

4.2 Evaluation of Building Management Response Based on the information provided by ZAR and its environmental consultant. Ambient Group, Inc. (Ambient), the building response actions appear to have been appropriate and in conformance with NYCDEP and NYCDOH guidelines relative to clean up of WTC generated dust/debris. ZAR hired Branch Services (Branch), a New York State certified asbestos abatement company, to perform initial cleanup of gross debris at 100 Church Street. These

11

CITY_21 MC100_014586884

NYC-WTC_000243578

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000243578Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000243532

EIA report for 100 Church Street preparation by TRC Engineers.

Similar indexed content

Compare copies and versions →