space above the suspended ceiling which acts as a return air plenum. Air then travels into the
return air risers and returns to the 7* floor fan room
The perimeter induction units, visible as units under the windows, are supplied through a supply
fan located on the 7* floor. The perimeter air handler forces air through risers running along
perimeter columns. The supply risers are connected to circular ducts connected to the perimeter
induction units on every floor. The return air from the perimeter units mixes with the supply air
on the floors and returns via interior system return air risers. There is no dedicated return air fan
for the perimeter air supply system.
In addition to the air supply from the main building HVAC system located on the floor,
supplemental air handling units have been installed in various locations to provide additional
cooling. These vary from floor to floor generally re-circulating the building air from above the
suspended ceiling through a cooling coil.
An inspection of the air handlers and ductwork indicated that visible accumulation of dust/debris
was present. Although the air handlers appeared to have been partially cleaned and there was no
gross debris observed which could be obviously associated with the WTC collapse, visible dust
was noted. The inspection of ductwork revealed the presence of significant accumulations of
dust and debris, which would not have been expected subsequent to a duct cleaning effort.
At the time of the inspection, the building had upgraded the filtering system to include high
efficiency filters for particulate control. These high efficiency filters replaced the normal bag
filtering system and significantly increased the filtering capability of the system that provides
conditioned air to the NYCLD space.
4.2 Evaluation of Building Management Response
Based on the information provided by ZAR and its environmental consultant, Ambient Group,
Inc. (Ambient), the building response actions appear to have been appropriate and in
conformance with NYCDEP and NYCDOH guidelines relative to clean up of WTC generated
dust/debris. ZAR hired Branch Services (Branch), a New York State certified asbestos
abatement company, to perform initial cleanup of gross debris at 100 Church Street. These
11
CITY_21 MC100_014587232
NYC-WTC_000243819