NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 55 pages

WTC redevelopment proposal, Law Department, 2001

Machine-extracted title · confidence 40%

Proposal for services related to World Trade Center cleanup project.

NYC-WTC_000243370–000243424
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Perry R. McNair page 3

construction. In addition, he implemented a database to record TBM penetration rates, hours of operation, and maintenance and core samples during the tunneling. This information was used to verify differing site claims during construction. This pipeline and tunnel project included installation of a 96-inch-diameter pipe, concrete backfilling grouting, and fiber optic installation. Six soft ground headings were excavated by shield and one drill and shoot heading.

1990-1991 Bradley Lake Hydroelectric Project, Alaska. Tunnel Inspector. Mr. McNair was responsible for inspection and proper procedures on concrete placement, grouting, and concrete finishing and repair. He performed civil inspection on site rehabilitation in this environmentally sensitive area. He monitored tunnel discharge flow rates to prevent adverse impacts to fish in the reservoir. He supervised time and material construction of a remote diversion dam, dredging of an existing diversion pool, and powerline site restoration. Previously on this project, Mr. McNair was a miner and driller on the project powerhouse and diversion tunnel. He was responsible for rockbolting the powerhouse excavation.

1988-1989 Valdez Terminal, Alaska. Foreman and Relief General Foreman. Mr. McNair worked with the oil spill contingency team and was certified to operate all types of oil spill equipment for land and sea.

1986 -1987 Bradley Lake Hydroelectric Project, Alaska. Miner/Driller. During Phase I construction, Mr. McNair worked on the powerhouse and diversion tunnel. During Phase 11, he was a shifter drilling and shooting head with steel sets. He was responsible for rockbolting the powerhouse excavation.

Prior Experience: Three years of concrete tunnel construction management in Alaska, including construction supervision for a 5-mile-long power tunnel utilizing a Robbins TBM, for which he instituted a dewatering scheme to drain the tunnel of an unexpected water inflow of 6,800 gallons per minute without impacting ongoing operations. Previously, 15 years of hands-on construction work and supervision for heavy construction projects on the Eastern Seaboard fi-om Virginia to Maine.

CITY_21 MCI 00_014587534

NYC-WTC_000243410

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000243410Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →