Daily work force report, World Trade Site, Jan 15 2002

Machine-extracted title · confidence 95%

Grace Contracting Corp. daily log of laborers and equipment at the World Trade site for January 15, 2002 night shift.

NYC-WTC_000237655
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 601 Road, Wtlltastona. N.Y. 11357-(718)7B7-9G00 DATE: 1715/02 NIGHT FINAL

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions: UNSEASONABLY MILD. YET BLUSTERY (35 mph WIND) & COLD. MOSTLY DARK.

Labor Equipment CLASSIFICATION QUANT. Description [MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT446 BACKHOE OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS g CAT 375 BUCKET 1 IRON WORKERS HITACHI 750 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER LOCAL 16 7 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS (FUEL)_______________ 1 MECHANICS TRUCK 1 1 MECHANICS 1 TOOL TRUCK HOUSE WRECKERS 3 TOOL VAN TEAMSTERS (STEEL AND DEBRIS; EUKES) 14 ROLL OFF DUMP TRAILERS LOW BED TRAILER DELIVERIES: HIGH DECK TRAILERS WELDING TRUCK FUELTRUCK 1 PICKUP TRUCKS 3 LIGHT TOWERS 5 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 DELAYS; LOST 3.5 HOURS DUE TO FDNY ACTIVITY OFFICE TRAILER7GENER. 1 IN THE HOLE. GRAPPLES DID NOT LOAD IN THE CARGO BOXES 3 HOiZE FLAT TRUCK 1 PUMP 2 RAINMAKER/GENIE LIFT 1

- Description of Work: COMPLETED WORK CONTINUED REMOVING DEBRIS FROM LOWER LEVELS__________________________________ MANNED WATERING STATIONS FOR DUST CONTROL____________________________________ MAINTAINED TRAFFIC INTO AND OUT OF AREA__________________________________________ APPROXIMATELY 3.5 HOUR DELAY DUE TO FDNY ACTIVITY RELATED TO FIRE IN THE HOLE. LOADS OUT: 63 EUKES OUT; 138

GRACE CONTRACTING CORP Approved By: Title: For: SUPERINTENDENT /QY "

DAILY WORK FORCE REPDRT0115N.xls

CONF I DEKTIF'ZF, 2IMC1 0 0_0 03415929 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000237655

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000237655Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000356547

Night final daily workforce and weather notes for World Trade site, Jan 15, 2002.

Similar indexed content

Compare copies and versions →