GRACE CONTRACTING CORP. 151-15 6ttl Road, Whiteslone, M.Y 11357-(718) 767-9000 DATE: 1/22/02 DAY FINAL
DAILY WORK FORCE REPORT
Job Name & Location; World Trade Center Contract No. Weather Conditions
Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 2 CAT 973 LOADER 1 OFFICE ENGINEER CAT 365 GRAPPLER 1 FOREMEN 1 CAT 375 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS 8 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 1200 GRAPPLER 1 LOCAL 15 5 185 CFM COMPRESSOR 1 CARPENTER 235 HAMMER HOE RAM 1 CARPENTER FOREMAN 1 MECHANICS TRUCK 2 TEAMSTERS (FUEL) 1 TOOL TRUCK MECHANICS 2 TOOL VAN 1 HOUSE WRECKERS 6 ROLLOFF DUMP TRAILERS 5 LOW BED TRAILER HIGH DECK TRAILERS 1 WELDING TRUCK 1 DELIVERIES. AWISCO FUEL TRUCK 1 AUSTER PICKUP TRUCKS 8 LIGHT TOWERS 5 SITE MULE 2 •NOTE: WTC TRUCKING 10 DRIVERS DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD OFFICE TRAILER/GENER. 1 CARGO BOXES 4 FLAT TRUCK 1 PUMP 2 LIGHT TOWERS USED 2.5 HOURS RAINMAKER/GENIE LIFT
Description of Work:_______________________________________________________________________ ANTICIPATED WORK_____________________________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER TWO TO ACCOMMODATE BRIDGE MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA LOADS OUT 61 YUKE LOADS 140
DELAYS: 1.5 HOURS DUE TO FDNY RECOVERY OF PA OFFICER. 45 MINUTES DUE TO ESCORT OF OFFICER
n GRACE CONTRACTING CORP Approved By: BY: Title:_______ For' superintendent
DAILY WORK FORCE REPORT0122D.xls
CITY_21MC100_000448041 NYC-WTC_000360913
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000342307
Day final staffing and equipment for World Trade, Jan 22, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356560
Daily labor/equipment roster for World Trade site, Jan 22, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429401
Day shift daily workforce and equipment details for World Trade site on 1/22/02.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267324
Day final daily workforce and equipment for World Trade Center construction.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267325
Day final daily workforce; World Trade Center location and equipment listed.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000407315
Daily workforce report listing personnel and equipment for World Trade Center site, Jan 22, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342309
Day final workforce and equipment for World Trade site, Jan 23, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000360912
Day final daily workforce and equipment at World Trade site, Jan 22, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419154
Day final daily workforce for World Trade Center site, Jan 22, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429416
Night shift staffing and equipment listings for World Trade Center project on 1/29/02.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342308
Night final daily workforce and equipment, Jan 22, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356563
Daily labor/equipment roster for World Trade site, Jan 23, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000342307
Day final staffing and equipment for World Trade, Jan 22, 2002.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356560
Daily labor/equipment roster for World Trade site, Jan 22, 2002.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429401
Day shift daily workforce and equipment details for World Trade site on 1/22/02.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267324
Day final daily workforce and equipment for World Trade Center construction.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267325
Day final daily workforce; World Trade Center location and equipment listed.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000407315
Daily workforce report listing personnel and equipment for World Trade Center site, Jan 22, 2002.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000342307
Day final staffing and equipment for World Trade, Jan 22, 2002.
Similar indexed content
NYC-WTC_000356560
Daily labor/equipment roster for World Trade site, Jan 22, 2002.
Similar indexed content
NYC-WTC_000429401
Day shift daily workforce and equipment details for World Trade site on 1/22/02.
Similar indexed content
NYC-WTC_000267324
Day final daily workforce and equipment for World Trade Center construction.
Similar indexed content
NYC-WTC_000267325
Day final daily workforce; World Trade Center location and equipment listed.
Similar indexed content