THE CITY OF NEW YORK DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF ENVIRONMENTAL COMPLIANCE ASBESTOS CONTROL PROGRAM
AIR MONITORING AND ANALYSIS SERVICE CONTRACT
SCOPE OF WORK
A. Introduction
All work performed under this contract must be in compliance with all applicable, relevant, and appropriate regulations, including but not limited to those of the United States Environmental Protection Agency (USEPA), the United States Department of Labor Occupational Safety and Health Administration (USOSHA), the New York State Department of Labor (NYSDOL), the New York State Department of Health Environmental Laboratory Approval Program (ELAP) and the New York City Department of Environmental Protection (NYCDEP). The services required must be provided during regular business hours and weekends. The number of samples and other tasks are estimates for bidding purposes, with no minimum guarantee. This contract will be awarded to the lowest responsive and responsible bidder. The items listed on the bid sheet reflects the types of services required. A pre-bid conference shall be scheduled at the DEP office , at 59-17 Junction Boulevard, 8*’’ floor.
B. Contract Term
This contract shall be in force for 120 consecutive calendar days from the NYC DEP commencement date.
C. Qualification
The laboratory must be in compliance with the National Environmental Laboratory Accreditation Conference (NELAC) standards and have certification by ELAP in the category of Airborne Asbestos by Transmission Electron Microscopy (TEM). Certification must be maintained for at least 6 consecutive proficiency testing rounds. Air monitoring technicians must possess valid NYS Asbestos Project Sampling Technician (APST) certificates. Technicians must have performed air monitoring for at least 2 years and conducted final clearance inspections on at least 50 asbestos abatement projects. A minimum of 5 APST must be available to conduct air monitoring. Proof of qualifications must be presented to NYC DEP upon request.
Sampling equipment must be in sufficient quantity to provide the turnaround time on each project. At a minimum the following equipment are required; air-sampling pumps (electric and battery operated) with flow rate capacities of 2 to 10 liters per minute, rotometers, mixed cellulose ester sample filters having pore size of 0.45um and electrical generators .
1
CITY_21MC100_002949797 NYC-WTC_000186729
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
Filed elsewhere
NYC-WTC_000164258
Report summarizing call volume, staffing levels, and operational status for the Lower Manhattan Air Quality Hotline.
7 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150994
Contract scope for air monitoring and analysis services under the DEP Asbestos Control Program, including compliance with federal and state regulations.
7 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164266
Correspondence urging submission of approved waiver requests for employees to earn paid overtime during cleanup operations.
7 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162853
Discussion regarding revisions to monitoring work specifications, including flow rate issues and asbestos sampling protocols.
3 shared non-person entities · 1 shared topics · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155430
Technical correspondence addressing asbestos air sampling methodology and pump flow rate specifications.
3 shared non-person entities · 1 shared topics · similarity 0.960
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162890
Technical discussion regarding discrepancies in NIOSH method flow rates and requirements for large sample volumes at 114 Liberty Street.
3 shared non-person entities · 1 shared topics · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141438
Contract scope defining regulatory compliance and bidding requirements for air monitoring services at the World Trade Center site.
7 shared non-person entities · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗3 shared non-person entities · 1 shared topics · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗4 shared non-person entities · 1 shared topics · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗4 shared non-person entities · 1 shared topics · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗3 shared non-person entities · 1 shared topics · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000164258
Report summarizing call volume, staffing levels, and operational status for the Lower Manhattan Air Quality Hotline.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164266
Correspondence urging submission of approved waiver requests for employees to earn paid overtime during cleanup operations.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150994
Contract scope for air monitoring and analysis services under the DEP Asbestos Control Program, including compliance with federal and state regulations.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141438
Contract scope defining regulatory compliance and bidding requirements for air monitoring services at the World Trade Center site.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140603
Contract establishing requirements for third-party asbestos monitoring and air sampling in residential buildings.
Similarity score 0.976 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140593
Contractual agreement establishing an independent firm to monitor debris cleanup and conduct air sampling.
Similarity score 0.976 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000164258
Report summarizing call volume, staffing levels, and operational status for the Lower Manhattan Air Quality Hotline.
Similar indexed content
NYC-WTC_000150994
Contract scope for air monitoring and analysis services under the DEP Asbestos Control Program, including compliance with federal and state regulations.
Similar indexed content
NYC-WTC_000164266
Correspondence urging submission of approved waiver requests for employees to earn paid overtime during cleanup operations.
Similar indexed content
NYC-WTC_000162853
Discussion regarding revisions to monitoring work specifications, including flow rate issues and asbestos sampling protocols.
Similar indexed content
NYC-WTC_000155430
Technical correspondence addressing asbestos air sampling methodology and pump flow rate specifications.
Similar indexed content