NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 2 pages

Site sign-in sheet and work progress report, Nov 2001

Machine-extracted title · confidence 90%

Daily log sheet recording company personnel sign-ins and safety observations regarding debris removal operations at the World Trade Center site in November 2001.

NYC-WTC_000182379–000182380
Page image
Scanned page image, NYC-WTC_000182380
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Shift Overlap Meeting Minutes 11/17/2001 Page 2 of2 jersey barriers on Liberty and West Streets. Bovis requests LM to indicate on tickets that even though the corrective actlon(s) needs to be implemented in the Bovis sector, they are not the responsibility of Bovis and should be directed to the responsible contractor; • Nicholson to address silica exposure issues, as ATC personal air sampling result during the installation of tie backs exceeded OSHA’s PEL for silica; • Bovis and Nicholson will provide hearing protection to workers in the vicinity of de-watering well installation as noise levels in this area where documented at 95 dBa; • Liberty Mutual discussed damaged sling to be removed from service.

TULLYSECTOS Work in Progress: 7'^ f* • Debris removal from Bankers Trust building; • Debris and steel removal from WTC 2; • Debris and steel removal from remnants of WTC 4; • Shoring along 1-9 subway; • Installation of crane platform at west side of WTC 4; • Preparation for installation of mats and equipment for slurry wall work east and south of Bovis at the slurry wall;

Safety Observations: • Verizon trenching - sloping is improved; • Bankers Trust - lighting in stairwells still not in place, LM concerned about emergency evacuation of the building • Welder flags for iron workers in pit not be moved with the work; • Jersey barriers need to be placed around opening to subway on haul road west of former WTC 4; • Truck spotter observed wearing dark coat with no reflective vest; • Respirator and eye protection use in Tully zone noted to be poor.

General Site Concerns • Pier 6 - Crane down, no report; • Pier 25 - no report; • ATC noted that they need somewhere within the Tully zone to place noise dosimeters on personnel that may be working in areas with elevated noise levels; DDC advised Tully and ATC to coordinate;

CITY_21MC100_003578758

NYC-WTC_000182380

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000182380Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →