machine-extracted · confidence unavailable · Check page ↗Site sign-in sheet and work progress report, Nov 2001
Machine-extracted title · confidence 90%Daily log sheet recording company personnel sign-ins and safety observations regarding debris removal operations at the World Trade Center site in November 2001.
NYC-WTC_000182379–000182380
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
rf- 2
Shift Overlap Meeting Minutes DATE: November I?, 2001
SHIFT GOE^G OFF: 3:00 pm -11:00 pm SHIFT GOING ON: 11:00 pm-7:00 am
Meeting Attendants: (See attached sign in sheet)
Companies/Organizations Represented: 1. Amec 2. ATC 3. Bovis 4. DDC 5. Liberty Mutual 6. Tulley
Sector Reports: AMEC SECTOR
Work in Progress: • Removing steel and debris from WTC 1; • Removal of demolition debris from WTC 6; • Removal of debris slide from WTCl on SW comer of WTC6;
Safety Observations: • Angel Airial not tieing off while on top of water truck; • Angel Airial using 6’ lanyards while on truck, should be using shorter lanyards; • Man baskets need overhead protection; • Crane on ramp to WTC 6 will be replaced by a wider crane, thereby requiring fall protection to be removed. New crane will be wide enough to preclude personnel access to the crane pad thereby eliminating fall hazard;
BOVIS SECTOR Work in Progress: • Debris removal at WTC 2;
Safety Observations: • Bovis concerned that Liberty Mutual tickets indicate safety violations in the Bovis zone that may not be the responsibility of Bovis. Tully is responsible for the correct installation of the personal fall arrest system currently installed along the
CITY_21MC100_003578757
NYC-WTC_000182379
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
Filed elsewhere
NYC-WTC_000154538
Operational period plan from the FDNY detailing actions for December 21, 2001 at the World Trade Center site.
4 shared non-person entities · 1 shared topics · similarity 0.913
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000126218
Department of Environmental Protection internal menu form dated December 12, 2006, associated with the building at 20 Dey Street.
2 shared non-person entities · 1 shared topics · similarity 0.910
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154452
Fax memo summarizing WTC daily activities including water access requests and a FEMA meeting on demolition permits.
3 shared non-person entities · 1 shared topics · similarity 0.910
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164098
Distribution of materials provided at January 15, 2002 WTC contractor health and safety meeting.
4 shared non-person entities · similarity 0.910
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000148742
Notice instructing staff to preserve original World Trade Center documents for potential legal actions against the City.
4 shared non-person entities · 1 shared topics · similarity 0.908
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154518
Operational period plan from the FDNY detailing actions for December 21, 2001 at the World Trade Center site.
4 shared non-person entities · 1 shared topics · similarity 0.905
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
5 shared non-person entities · similarity 0.903
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000142413
Comprehensive FAQ addressing downtown building access, reopening areas, property manager contact procedures, and building damage status in lower Manhattan.
2 shared non-person entities · 1 shared topics · similarity 0.901
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164626
DEP internal memo ensuring all staff with WTC information receive and complete Law Department questionnaire by October 29, 2004.
1 shared non-person entities · similarity 0.899
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000099219
Letter to DEP listing potential contamination questions regarding WTC debris cleanup at 93 Nassau Street.
1 shared topics · similarity 0.899
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149936
Joint OSHA and Bechtel crane inspection report analyzing safety conditions at the World Trade Center site.
5 shared non-person entities · similarity 0.898
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.943 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164098
Distribution of materials provided at January 15, 2002 WTC contractor health and safety meeting.
Similarity score 0.934 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164098
Distribution of materials provided at January 15, 2002 WTC contractor health and safety meeting.
Similarity score 0.933 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.932 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.930 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Similar indexed content
Operational period plan from the FDNY detailing actions for December 21, 2001 at the World Trade Center site.
Similar indexed content
NYC-WTC_000126218
Department of Environmental Protection internal menu form dated December 12, 2006, associated with the building at 20 Dey Street.
Similar indexed content
Fax memo summarizing WTC daily activities including water access requests and a FEMA meeting on demolition permits.
Similar indexed content
NYC-WTC_000164098
Distribution of materials provided at January 15, 2002 WTC contractor health and safety meeting.
Similar indexed content