NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Asbestos inspection log, 130 Liberty Street, March 2009

Machine-extracted title · confidence 95%

Department of Environmental Protection record documenting an asbestos inspection at 130 Liberty Street on March 18, 2009.

NYC-WTC_000181971
Page image
Scanned page image, NYC-WTC_000181971
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 03/18/09 Floor Zip Borough Block Lot Squad # Badge # Various_________ 1 row5 -J - 54 1 1 AO61 Inspector Building Type Basis of Inspection Photos Taken H. Guirguis A TRU2068MN08 Yes Contractor’s Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner's Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1430 Broadway New York One Liberty Plaza New York State Zip Phone state Zip Phone NY 10018 NY 10006 (212)962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj. Mgr./TRC Environmental 08:00am - 10:00am On arrival I met Nugent Gerald, Supervisor for LVI Environmental at the LVI field office, who informed me that a total of 1 Handler Supervisor and 15 Asbestos Handlers were in the 11*" floor today. The daily work schedule informed me of the following. 1. Il'" floor: 15 men- each- Exteriorfagade removal 2.12‘"&11'" floor: 12 men-Eagle-installing decks for fagade work 3. 3'" floor: 50 men-scrape fireproofing clear oft floor 4. 2"" floor: 58 men-clear off floor, scrape fireproofing 5. Y' floor: 76men-clear floor, cut ducts, demo walls, ceilings, etc. 6. Various floors : 14 men loading out boxes to ATC trailer I used the north hoist to the 11*" floor. 1. 11*" floor: A handler supervisor and 15 workers were found in the process of Removing Aluminum column covers and fascia with non-friable ACM caulking material and glass from the east side south end area. Poly wrapped the aluminum pieces, boxing debris, fine spraying amended waler on the Gaylord boxes and the work area. Inspection was done on the work area. I used the stair A to the 10*" floor and inspection was done to the decon Area.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s Initial

Borough l=Manliattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=Public Owned Property

CITY_DEP_WORBY_CANNATA_SUBP_000131079

NYC-WTC_000181971

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000181971Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →