Load backup memo for Mayor's Office of Emergency Management, Feb · Box 7DCASNYC-WTC_000173925
Job memorandum detailing electrical load backups by emergency generators and UPS for the Mayor's Office at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.998
Fax transmittal for load backup memo, December 1998 · Box 7DCASNYC-WTC_000173926
Covering fax transmitting a job memorandum regarding electrical load backups for the Mayor's Office.
1 shared topics · Same agency, volume and box · similarity 0.912
Change Order #71 submission for pump wiring, Feb 1999 · Box 7DCASNYC-WTC_000171639
Ambassador Construction submits Change Order #71 to install two 3-phase fields for circulation pumps at the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.901
Project Description Memo for OEM Space, March 1998 · Box 7DCASNYC-WTC_000167705
Memorandum describing the project scope for the Mayor's Office of Emergency Management occupying 35,000 square feet on the 23rd floor of 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.899
Change Order #71 for electrical work, 7 WTC, Feb 1999 · Box 7DCASNYC-WTC_000168478
Memo submitting Change Order #71 for $4,579 to install three-phase fields for circulation pumps at 7 World Trade Center.
Same agency, volume and box · similarity 0.899
Project timeline notes for IT infrastructure at 7 WTC, Nov · Box 7DCASNYC-WTC_000173732
List of scheduled tasks including rack building, power availability, and workstation installation dates for the data center.
1 shared topics · Same agency, volume and box · similarity 0.898
Fax transmittal for LAN visit and UPS memos, February 1999 · Box 7DCASNYC-WTC_000173941
Job memorandum regarding a field meeting to review the facility monitoring system scope.
1 shared topics · Same agency, volume and box · similarity 0.897
Change Order #44R submission, 7 WTC, March 1999 · Box 7DCASNYC-WTC_000168437
Contractor submits Change Order #44R for $85,893 to install fuel lines and supports at 7 World Trade Center.
Same agency, volume and box · similarity 0.896
Project directive for 7 World Trade Center restoration, Feb 9, · Box 7DCASNYC-WTC_000173961
Directive to incorporate monitor restoration, food service equipment, and UPS protection into the 7 World Trade Center project.
1 shared topics · Same agency, volume and box · similarity 0.896
Revised proposal fax for OEM design services, Oct 1997 · Box 7DCASNYC-WTC_000167253
Fax transmission of a revised proposal document regarding architectural and engineering design services for the Mayor's Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.896
HVAC revised quotation fax, June 1998 · Box 7DCASNYC-WTC_000172331
Fax from P.J. Air Conditioning Contractors submitting a revised price quote for HVAC work at the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.896
Construction proposal, 7 World Trade Center OEM, June 1998 · Box 7DCASNYC-WTC_000172285
Revised construction proposal dated June 11, 1998, for Mayor's Office of Emergency Management space at 7 World Trade Center with total project cost of $11,645,746.00.
Same agency, volume and box · similarity 0.895