NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Office of Energy Management at 7 World Trade
Document / 6 pages

Revised proposal fax for OEM design services, Oct 1997

Machine-extracted title · confidence 80%

Fax transmission of a revised proposal document regarding architectural and engineering design services for the Mayor's Office of Emergency Management.

NYC-WTC_000167253–000167258

Folder label: “Office of Energy Management at 7 World Trade

Page image
Scanned page image, NYC-WTC_000167253
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

10/21/97 TUE 12:28 FAX 212 736 3519 COSENTINI ASSOC. 121002

kve I P'.r; A. Il hr, i-. N,jw Yoii,. .NY !(1I; 21J 01 .>‘<10 I'll; ■ ■' WWW i' .•'sci'i'. ■

/i zF Xz -zr z ASSOCIATES LLP Cosentini Assoeiotas UP Conwhing Engineer!

A. Mni'. FL I.' 1'1. October 17. 1997 / r. l-.'lv.i, 1'1 Revised October 21, 1997 n AAr-- "* ' .'.'■ichi'j.'l ;;

H ■ ■' v-' Mr. Joseph Aliotta Swanke Hayden Connell, Ltd. 295 Lafayette Street New York, NY 10012

Re: Office of Energy Management at 7 World Trade

Dear Joe:

We are pleased to submit our proposal to act as your consulting engineer for the preparation of plans and specifications for the mechanical, electrical, plumbing and fire protection facilities for the office of Emergency Management at 7 World Trade.

Our work will include the complete design of heating and air conditioning ductwork. lighting circuiting, controls, sprinklers, plumbing, fire protection, conduit and power for security, alarms systems and other specialties designed by others. In addition, we will provide an emergency generator, controlled inspections and balancing review.

As part of our effort we will coordinate our work with your office, representatives of DCAS and all special consultants.

Our work will include the following scope:

I. HVAC F.ngineering:

Complete air conditioning system using base building systems on the floor Supplemental AC equipment and air distribution not included Ventilation for toilets, lockers and smoking is connected to existing exhaust ducts on the floor Kitchen exhaust is not included Lan A/C is provided and connected to existing condenser water on floor

Ne*

NYC-WTC_000167253

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000167253Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →