Site inspection form FR-2, November 24, 1998

Machine-extracted title · confidence 50%

Form FR-2 recording site access and activities at the Mayor's Office location on November 24, 1998.

NYC-WTC_000174031

Folder label: “Field Report

Page image
Scanned page image, NYC-WTC_000174031
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SwANKE Hayden Connell Architects

Field Report

Project Name and Address: Project No: 5576A OEM Project Director/Manager: 7 World Trade Center Carl Meinhardt / Joseph Aliotta New York, NY 10048 Client; Silverstein’s Properties Inc. Contractor: Ambassador Construction Co.

Field Report No Date and Time Present at Site FR-2 November 24, 1998 Submitted By Date Prepared Juan M. Mejia November 24, 1998 Persons Present at Site: cc: Martin Schneider / AC, Glenn Pymento / DCAS JM /SHCA Joe Aliotta / SHCA, John Vande Plasse / SHCA

WORK IN PROGRESS: 1. Protective wall @ west side 2. Installation of projector enclosures by Airflex 3. Raised floor @ west side

ADDITIONAL OBSERVATIONS:

1. Conduit above women’s core bathroom has to be removed , is below ceiling. 2. Speaker /Strobes have not been relocated @ reception area, Commissioners Suite, Training Room. (As requested in memo). 3. Thermostats have not been relocated as per Power & Telephone Location Plan. 4. Track Light @ press Room feed not in wall, same as feeds for undercabinet lights. 5. Insulation above perforated metal ceiling @ EOC has not been installed. 6. Projection screens have not been installed @ ceilings. 7. Walls @ reception area has to be cut for the installation of the flush wood base. 8. LAN room cage for Bell Atlantic equipment has not been installed nor have you submitted shop drawings for review of clearances. 9. Fire Extinguisher cabinet openings @ EOC and corridors are not cut. 10. Please coordinate the location of door # 11A with FSK’s revision. (blocking does not seem correct) 11. Door 53A is installed incorrectly, it should be above raised floor not slab. 12. Comer wall at end of corridor in front of door # 52 should be 90 DEG. not as built. Please revise as per plan.

ITEMS TO DOCUMENT / VERIFY

I. Installation of shielding @ floors of Mayor’s & Commissioners Conf. Room.

INFORMATION OR ACTION PENDING

1. Alternate solution for routing fuel oil piping @ isf Floor FSK’ shave been issued for pricing.

ATTACHMENTS

None.

W \5576\A\OEMDOCS\FIELDR£PORT\FR11-24-98 DOC

Swanke Hayden Connell Ltd.. Swanke Hayden Connell & Partners LLP 295 Lafayette Street, New York, New York 10012 212 226 9696, Fax 212 219 0059

NYC-WTC_000174031

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000174031Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

RFI log for 7 WTC EOC project, July-August 1998 · Box 7DCAS

NYC-WTC_000173590

Request for Information log documenting responses to queries about wall offsets and dimensions at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.928

machine-extracted · confidence unavailable · Check page ↗
RFI log for 7 WTC EOC project, September 1998 · Box 7DCAS

NYC-WTC_000173615

Request for Information log tracking queries and responses regarding wall offsets and wet columns at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.924

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →