Project Name and Address: Project No;
5576A
OEM Project Director/Manager:
7 World Trade Center Carl Meinhardt / Joseph Aliotta
New York, NY 10048 Client:
Silverstein’s Properties Inc.
Contractor:
Ambassador Construction Co.
Field Report No Date and Time Present at Site
FR-1 November 17, 1998
Submitted By Date Prepared
Juan M. Mejia November 17, 1998
Persons Present at Site; cc: Martin Schneider / AC, Glenn Pymento / DCAS
JM /SHCA Joe Aliotta / SHCA, John Vande Plasse / SHCA
WORK IN PROGRESS:
1. Protective wall @ west side
2. Installation of projector enclosures by Airflex
3. Raised floor @ west side
ADDITIONAL OBSERVATIONS:
1. Conduit above women’s core bathroom has to be removed , is below ceiling.
2. Speaker /Strobes have not been relocated @ reception area, Commissioners Suite, Training Room. (As requested in memo).
3. Thermostats have not been relocated as per Power & Telephone Location Plan.
4. Track Light @ press Room feed not in wall, same as feeds for undercabinet lights.
5. Insulation above perforated metal ceiling @ EOC has not been installed.
6. Projection screens have not been inslalled @ ceilings.
7. Walls @ reception area has to be cut for the installation of the flush wood base.
8. LAN room cage for Bell Atlantic equipment has not been installed nor have you submitted shop drawings for review of clearances.
9. Fire E.xtinguisher cabinet openings @ EOC and corridors are not cut.
10. Please coordinate the location of doer# 1 lA with FSK’s revision. (blocking does not seem correct)
ITEMS TO DOCUMENT / VERIFY
1. Installation of shielding @ floors of Mayor’s & Commissioners Conf. Room.
INFORMATION OR ACTION PENDI^G
1. Alternate solution for routing fuel oi: piping @ 1st. Floor
ATTACHMENTS
None.
W ,5576\A\OEMOOCS-FIELDREPOR'nFR11-17-9S DOC
Swanke Hayden Connell Ltd./Swanke Hayden Connell & Partners LLP
295 Lafayette Street, New York, New York 10012
212 226 9696, Fax 212 219 0059
NYC-WTC_000174030
OCR can misread numbers and units. Confirm readings against the page image before using them.