Same-box records
Breakdown of change orders for 7 WTC construction, Jan 1999 · Box 7DCASNYC-WTC_000174006
A document listing line items and costs for various construction tasks including concrete work, cabling, and electrical installations at 7 World Trade Center.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.978
NYC-WTC_000174007 · Box 7DCAS1 shared non-person entities · Same agency, volume and box · similarity 0.917
Revised Installation Schedule for EOC NYC Job 3585, Jan 1999 · Box 7DCASNYC-WTC_000173982
Letter outlining a revised schedule for the installation and completion of emergency operations center equipment at the New York City site.
Same agency, volume and box · similarity 0.914
Fax regarding desk manufacturer specifications for 7 WTC, Apr 1998 · Box 7DCASNYC-WTC_000167704
Facsimile from a construction representative specifying acceptable desk manufacturers for the Office of Emergency Management at 7 World Trade Center.
1 shared non-person entities · Same agency, volume and box · similarity 0.912
NYC-WTC_000173987 · Box 7DCAS1 shared non-person entities · Same agency, volume and box · similarity 0.906
Letter regarding console safety at EOC - NYC, Jan 14 · Box 7DCASNYC-WTC_000174012
Complaint about other trades standing on equipment consoles and request for immediate cessation of unsafe practices.
2 shared non-person entities · Same agency, volume and box · similarity 0.886
Change order for electrical riser installation, 7 World Trade Center, · Box 7DCASNYC-WTC_000171626
Proposal to install galvanized conduit and fiber optic cables between the loading dock and 23rd floor LAN room for $45,000.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.883
Consultant meeting minutes #16, Nov 10 1998 · Box 7DCASNYC-WTC_000172260
Minutes of the sixteenth consultant meeting detailing construction status and fuel oil piping installation.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.880
Minutes of Consultant Meeting #17, 7 WTC, Nov 1998 · Box 7DCASNYC-WTC_000173854
Meeting minutes from Ambassador Construction regarding project status for the Mayor's Office of Emergency Management at 7 World Trade Center.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.879
Consultant's Meeting #17 Minutes, 7 World Trade Center, Nov 1998 · Box 7DCASNYC-WTC_000166702
Meeting minutes from the Mayor's Office of Emergency Management project at 7 World Trade Center discussing steel work, fuel oil tank piping installation, and equipment delivery on…
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.878
Change Order #063 memo, 7 WTC, Jan 1999 · Box 7DCASNYC-WTC_000168504
Memo from Ambassador Construction submitting Change Order #063 for $1,912 to install a pipe sleeve and cabling at 7 World Trade Center.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.878
Change Order #63 submission, 7 WTC, Jan 1999 · Box 7DCASNYC-WTC_000171444
Ambassador Construction letter dated January 29, 1999, submitting Change Order #63 for $1,912 to install a pipe sleeve and cable at 7 World Trade Center.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.877