NYC-WTC_000173986
Letter noting a surprise request for forty-three desks instead of five and demanding a detailed project schedule.
Same agency, volume and box · similarity 0.914
machine-extracted · confidence unavailable · Check page ↗Letter outlining a revised schedule for the installation and completion of emergency operations center equipment at the New York City site.
NYC-WTC_000173982–000173983Folder label: “EOC, NYC, Furniture Installation, NL-Job 3585”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
JAN-14-1999 10:40 DCA5-DRES +212 669 4107 P.03/08
N_ « • r A L } M ff novmjnk uMrreo 8665 C8™uryAv«nu«
Canadi Onwt) LSN 7K2 T«iephan® (905)850-3500 F«x (90S) 858-7633 E-Mail: nowalirkettt.com
January 13,1998
Mr. William Diamond tel: 212-669-7111 Commissioner of New York City fax; 212-669-8992
Re: EOC, NYC, Furniture Installation, NL-Job 3585
Dear Mr. Diamond: Thank you for your telephone call on January 12/99. The following repiresents our revised schedule:
• Installation to commence Jan. 6/99 • Completion date based on the original proposal would subsequently have been on January 27/99. • Special accelerated installation of 5 positions - Jan. 15/99 • Revised accelerated substantial completion - Jan. 22/99 (Jan. 25/'99, if workers do not show for Ivlartm Luther King Holiday)
Please note that Nova-Link Limited quoted and was originally allotted a three week installation window. Tlie Nova-Link Limited schedule was planned for such a time line once the installation commenced. A time lapse between the installation of the base spine and the console top is intended to allow the electrical servicemen efficient access.
Please review the foUovong documents:
1) Last schedule received July 98, showing the three week installation vdndow.
2) Ambassador Construction's instructions showing 5 complexes of 43 desks dated January 12/99 and Nova-Link's five position conunitment for Januaiy 15/99.
3) Nova-Link's response of January 12/99 to Ambassador Construction.
4) Nova-Link's request to Ambassador Construction for cooperation January 13/ 99
NYC-WTC_000173982
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000173986
Letter noting a surprise request for forty-three desks instead of five and demanding a detailed project schedule.
Same agency, volume and box · similarity 0.914
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000174006
A document listing line items and costs for various construction tasks including concrete work, cabling, and electrical installations at 7 World Trade Center.
Same agency, volume and box · similarity 0.907
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173854
Meeting minutes from Ambassador Construction regarding project status for the Mayor's Office of Emergency Management at 7 World Trade Center.
Same agency, volume and box · similarity 0.907
machine-extracted · confidence unavailable · Check page ↗Same agency, volume and box · similarity 0.907
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000174012
Complaint about other trades standing on equipment consoles and request for immediate cessation of unsafe practices.
1 shared topics · Same agency, volume and box · similarity 0.899
machine-extracted · confidence unavailable · Check page ↗1 shared topics · Same agency, volume and box · similarity 0.894
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167704
Facsimile from a construction representative specifying acceptable desk manufacturers for the Office of Emergency Management at 7 World Trade Center.
Same agency, volume and box · similarity 0.892
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000166702
Meeting minutes from the Mayor's Office of Emergency Management project at 7 World Trade Center discussing steel work, fuel oil tank piping installation, and equipment delivery on…
Same agency, volume and box · similarity 0.889
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173561
Minutes from consultant meeting regarding fuel oil piping routes and project status at the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.888
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172260
Minutes of the sixteenth consultant meeting detailing construction status and fuel oil piping installation.
Same agency, volume and box · similarity 0.888
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173577
Meeting minutes from Ambassador Construction Co. detailing project status including floor chopping and installation work at the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.886
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173798
Meeting minutes from July 28, 1998 regarding shop drawing status for the Mayor's Office of Emergency Management renovation project.
Same agency, volume and box · similarity 0.884
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000173986
Letter noting a surprise request for forty-three desks instead of five and demanding a detailed project schedule.
Similarity score 0.948 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000174012
Complaint about other trades standing on equipment consoles and request for immediate cessation of unsafe practices.
Similarity score 0.942 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000174006
A document listing line items and costs for various construction tasks including concrete work, cabling, and electrical installations at 7 World Trade Center.
Similarity score 0.942 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167704
Facsimile from a construction representative specifying acceptable desk manufacturers for the Office of Emergency Management at 7 World Trade Center.
Similarity score 0.939 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.938 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000174011
A revised cost breakdown for video and audio interface equipment installation at the Mayor's Office of Emergency Management in 7 World Trade Center.
Similarity score 0.937 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000173986
Letter noting a surprise request for forty-three desks instead of five and demanding a detailed project schedule.
Similar indexed content
NYC-WTC_000174006
A document listing line items and costs for various construction tasks including concrete work, cabling, and electrical installations at 7 World Trade Center.
Similar indexed content
Meeting minutes from Ambassador Construction regarding project status for the Mayor's Office of Emergency Management at 7 World Trade Center.
Similar indexed content
Similar indexed content
NYC-WTC_000174012
Complaint about other trades standing on equipment consoles and request for immediate cessation of unsafe practices.
Similar indexed content