machine-extracted · confidence unavailable · Check page ↗Revised Installation Schedule for EOC NYC Job 3585, Jan 1999
Machine-extracted title · confidence 95%Letter outlining a revised schedule for the installation and completion of emergency operations center equipment at the New York City site.
NYC-WTC_000173982–000173983Folder label: “EOC, NYC, Furniture Installation, NL-Job 3585”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
JAN-14-1999 10:40 DCA5-DRES +212 669 4107 P.03/08
N_ « • r A L } M ff novmjnk uMrreo 8665 C8™uryAv«nu«
Canadi Onwt) LSN 7K2 T«iephan® (905)850-3500 F«x (90S) 858-7633 E-Mail: nowalirkettt.com
January 13,1998
Mr. William Diamond tel: 212-669-7111 Commissioner of New York City fax; 212-669-8992
Re: EOC, NYC, Furniture Installation, NL-Job 3585
Dear Mr. Diamond: Thank you for your telephone call on January 12/99. The following repiresents our revised schedule:
• Installation to commence Jan. 6/99 • Completion date based on the original proposal would subsequently have been on January 27/99. • Special accelerated installation of 5 positions - Jan. 15/99 • Revised accelerated substantial completion - Jan. 22/99 (Jan. 25/'99, if workers do not show for Ivlartm Luther King Holiday)
Please note that Nova-Link Limited quoted and was originally allotted a three week installation window. Tlie Nova-Link Limited schedule was planned for such a time line once the installation commenced. A time lapse between the installation of the base spine and the console top is intended to allow the electrical servicemen efficient access.
Please review the foUovong documents:
1) Last schedule received July 98, showing the three week installation vdndow.
2) Ambassador Construction's instructions showing 5 complexes of 43 desks dated January 12/99 and Nova-Link's five position conunitment for Januaiy 15/99.
3) Nova-Link's response of January 12/99 to Ambassador Construction.
4) Nova-Link's request to Ambassador Construction for cooperation January 13/ 99
NYC-WTC_000173982
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
NYC-WTC_000174006
A document listing line items and costs for various construction tasks including concrete work, cabling, and electrical installations at 7 World Trade Center.
Same agency, volume and box · similarity 0.907
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173854
Meeting minutes from Ambassador Construction regarding project status for the Mayor's Office of Emergency Management at 7 World Trade Center.
Same agency, volume and box · similarity 0.907
machine-extracted · confidence unavailable · Check page ↗1 shared topics · Same agency, volume and box · similarity 0.907
machine-extracted · confidence unavailable · Check page ↗1 shared topics · Same agency, volume and box · similarity 0.899
machine-extracted · confidence unavailable · Check page ↗1 shared topics · Same agency, volume and box · similarity 0.894
machine-extracted · confidence unavailable · Check page ↗Same agency, volume and box · similarity 0.892
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000166702
Meeting minutes from the Mayor's Office of Emergency Management project at 7 World Trade Center discussing steel work, fuel oil tank piping installation, and equipment delivery on…
Same agency, volume and box · similarity 0.889
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173561
Minutes from consultant meeting regarding fuel oil piping routes and project status at the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.888
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172260
Minutes of the sixteenth consultant meeting detailing construction status and fuel oil piping installation.
Same agency, volume and box · similarity 0.888
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173577
Meeting minutes from Ambassador Construction Co. detailing project status including floor chopping and installation work at the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.886
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173798
Meeting minutes from July 28, 1998 regarding shop drawing status for the Mayor's Office of Emergency Management renovation project.
Same agency, volume and box · similarity 0.884
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
No available related records indexed in this group.
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Similar indexed content
NYC-WTC_000174006
A document listing line items and costs for various construction tasks including concrete work, cabling, and electrical installations at 7 World Trade Center.
Similar indexed content
Meeting minutes from Ambassador Construction regarding project status for the Mayor's Office of Emergency Management at 7 World Trade Center.
Similar indexed content
Similar indexed content
Similar indexed content