Machine-extracted title · confidence 95%

Job memorandum regarding a field meeting to review the facility monitoring system scope.

NYC-WTC_000173941–000173943

Folder label: “Mayor's Office of Emergency Management

Page image
Scanned page image, NYC-WTC_000173941
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

02/16/99 17:15 FAI 2122190256 SffANKE HAYDEN CONNFTr @002 02/16/90 13.00 FAX 212 738 3519 CO8ENTINI ASSOCIATES @002/003

COSENTTNl ASSOC1IATES IXP ■'^rWO PENN. PLAZA, NEW YORK, NY MUI" llJ^15s>600w FAX11J-61W780

JOB 3T^ ORANDUM

TO: Mr. Mithael W. Maybaum SUBJECT: Mayor’s Office of Emergency Management FROM: Vai Lemeshev JOB NO: 1854

CC: Mr.JoeAliatta,SHCA, DATE; February 12,1999 Mx. Mania Schneider, Ambassador Revised Fcbnuiry 16,1999

Ambassador Construction Corp, requested our participatioD in the field meeting to review scope and coordinate work associated witiitfae fecility monitoring system and to be i>eifonnfid by Johnson Contiols, Inc.

Meeting was scheduled and took place on February 11,1999, but representative from Johnson Controls, Inc. was not in attendance.

As per request of Mr. Gien Pimento we have reviewed operation at air conditioning equipment serving the LAN room.

The folhjvdng aw our finttiogs andteconunendations:

At the time of survey all three (3) air conditioning units wore in operation.

Jr diouldbe noted, that maximum two (2) AC units shall be in operation siniahaneously - one Unix is a Sftend-*by and should be activated only when cos ofthe running unite toils or when high room temperatoro is detected.

Momtocing of Wo operation of AC units and room conditions is We woA to be pofonned by Johnson Controls Joe.

Mechanics fiom the Aback Entaijaises were on the job site setiiiig-np and adjusting We units. They were verbally instructed to shut-down one AC unit (AC-2) and to set one unit (AC-3) at 72’ F end second one (AOI) at 75" F. Aj^ustable vanes at the discharge grillesi should be adjusted to direct air horizontally and away fiom any obstruction such as equipment racks, cable trays, etc. to prevent short circuitiag of the air and, as a result, short eneling of the compressor and unit shut'dov'n without any remote alarm.

It was mentioned by Mr. Glen Pimento that not all toe conununieation eqoipinent, scheduled for installation; is actually in the LAN room but OEM is couMdering to install additional equipment (UPS).

There is sufficient capacity of the AC equipment in the LAN room to handle the existing and fiitura load.

NYC-WTC_000173941

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173941Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →