machine-extracted · confidence unavailable · Check page ↗RFI re: generator room protection, October 1998
Machine-extracted title · confidence 92%Request for information regarding additional fuel oil piping protection in the generator room at the Mayor's Office of Emergency Management.
NYC-WTC_000173672Folder label: “Mayor's Office of Emergency Management 7 World Trade Center 1, 7 & 23rd Floors Amb. Job # S57-5175”

OCR status: ocr · source: ours
NYC 9/11 Public Portal Document $796 14/98 10:407141 FAZ21102815 3700 15 :40 ПСТ 14 SWACO EATENN AUSOCLATES LLP '9B 11:Ø4 FR AMBASSADOR CONSTR. C021Z 949 9762 TO 2190059 AMBASSADOR CONSTRUCTION CO., INC. ) MR. J. MaJIA 219-0059 P.0L 021002/80021 Ip. REQUEST FOR INFORMATION To: RE: Juan Mejia Swanke Hayden Connell Mayor's Office of Emergency Management 7 World Trade Center 1.7 & 23rd Floors Amb.Job #S57-5175 Date: October 14,1998 RFI #34. Silverstein feels that they need more protection to the fuel ail piping in the generator room in case of leaks. There is none provided. Please advise. MS:am CIWPWINGDIWPDOC3IDEMOEMA1.WPD Awa's have been reviewed be silverstein and PA. Dochments call for two (2) high level twitches in series and solenoid vaiue on supply live. Please, advice it more protection reguired.v.lemesher C.0-10.15-48 317 MADISON AVENUE. NEW YORK, NY 10017, 212 922 1020, FAX 212 949 9762 ** TOTAL PADE.01 # NYC-WTC_000173672
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
NYC-WTC_000171639
Ambassador Construction submits Change Order #71 to install two 3-phase fields for circulation pumps at the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.915
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171318
Contractor submission of revised change order #44R for fuel oil line supports, enclosures, and new routing at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.914
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000166730
Log entries recording received faxes and requests for information related to the 7 World Trade Center project in 1995.
1 shared topics · Same agency, volume and box · similarity 0.912
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167697
Architectural firm distribution memo routing project information regarding Emergency Management facility.
Same agency, volume and box · similarity 0.911
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173652
Log of incoming and outgoing faxes between Ambassador Construction and the Office of Emergency Management regarding project communications.
1 shared topics · Same agency, volume and box · similarity 0.909
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173033
Letter detailing scope and cost reductions for electrical and audiovisual work at the Mayor's Office of Emergency Management following a review of bid items.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.909
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000166740
Minutes from the 11th consultant meeting at 7 World Trade Center dated September 29, 1996.
1 shared topics · Same agency, volume and box · similarity 0.907
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000166743
Cover sheet for the Request for Information log documenting 37 received RFI items for the 7 World Trade Center project as of September 16, 1998.
1 shared topics · Same agency, volume and box · similarity 0.907
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000166727
Minutes from the 12th consultant meeting at 7 World Trade Center dated October 5, 1998.
1 shared topics · Same agency, volume and box · similarity 0.907
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173139
Letter from Ambassador Construction Company detailing scope and proposal changes for the Mayor's Office renovation.
1 shared topics · Same agency, volume and box · similarity 0.907
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000166748
Minutes from the 9th consultant meeting at 7 World Trade Center dated September 15, 1998.
1 shared topics · Same agency, volume and box · similarity 0.906
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
No available related records indexed in this group.
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000171908
Facsimile transmission cover sheet from Ambassador Construction dated October 22, 1998, regarding OEM change orders.
Filed in the same folder
NYC-WTC_000173182
Change order from Ambassador Construction for furnishing a bullet-resistant door at the Mayor's Office of Emergency Management.
Filed in the same folder
Similar indexed content
Ambassador Construction submits Change Order #71 to install two 3-phase fields for circulation pumps at the Mayor's Office of Emergency Management.
Similar indexed content
NYC-WTC_000171318
Contractor submission of revised change order #44R for fuel oil line supports, enclosures, and new routing at 7 World Trade Center.
Similar indexed content