RFI Log: Finish specifications for 7 World Trade Center fixtures,

Machine-extracted title · confidence 95%

Log of requests for information regarding finish specifications for door rings and exit fixtures at 7 World Trade Center.

NYC-WTC_000173671

Folder label: “RFI Log

Page image
Scanned page image, NYC-WTC_000173671
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

OEM Swanke Hayden Connell Architects 7 World Trade Center Project No.5576A Total RFI's Received 40 Revised 09/16/98 Total Responses Received 40 RFI LOG

31 9/28/98 WHAT IS THE FINISH OF THE DR TYPE RINGS ON THE DR RINGS SHOULD BE BRUSHED ALUMINUM FINISH. 9/28/98 FIXTURE TYPE "F"

32 9/29/98 FINISH FOR EXIT FIXTURES, RED ON WHITE W/SATIN ALUM RED ON WHITE WITH SATIN ALUMINUM IS CORRECT. 9/29/96 FIN. OR DIFFERENT? THE CUT WAS APPROVED BUT FIXTURE SCHEDULE DOES NOT SHOW FINISH.

33 10/13/98 FAN RM. BUS DUCT: THIS SYSTEM IS TO HAVE 800 AMP. 3 DELETE NEUTRAL FROM BUS TAP TO ATS #2 . REVISE 10/15/98 PHASE 4 WIRE TAKE OFF TO FEED (2) SETS OF 500MCM, (2) FAN POWER BOX 277V 1 PHASE WIRING AS PER DRAWlUNG NEUTRALS AND (2) GROUNDS. IT FEEDS 277/480 VOLT REVISION (SEE ATTACHED ELECT. DRAWIONG REVISION SERVICES. BUS DUCT IS A 3PHASE 3 WIRE DUCT. DRAWING El.23) 34 10/14/98 SILVERSTEIN FEELS THAT THEY NEED MORE PROTECTION DWGS. HAVE BEEN REVIEWED BY SILVERCTEIN AND PA 10/15/98 NOT ACCEPTABLE TO THE FUEL OlUL PIPING IN THE GENERATOR ROOM IN DOCUMENTS CALL FOR (2) HIGH LEVEL SWITCHES IN RESPONSE WILL CASE OF A LEAK. THERE IS NO PROTECTION. SERIES AND A SOLENOID VALVE ON SUPPLY LINE. REVIEW AGAIN.

W.\OEM\docs\ RFI LOG 1- xIs Printed 10/20/98 9 16 AM Pages

NYC-WTC_000173671

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173671Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

RFI log for OEM at 7 WTC, Sep 1998 · Box 7DCAS

NYC-WTC_000173572

Request for Information log tracking inquiries regarding construction issues at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.942

machine-extracted · confidence unavailable · Check page ↗
RFI log for 7 WTC EOC project, September 1998 · Box 7DCAS

NYC-WTC_000173607

Request for Information log tracking queries and responses regarding wall offsets and wet columns at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.923

machine-extracted · confidence unavailable · Check page ↗
RFI log for 7 WTC EOC project, September 1998 · Box 7DCAS

NYC-WTC_000173615

Request for Information log tracking queries and responses regarding wall offsets and wet columns at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.921

machine-extracted · confidence unavailable · Check page ↗
RFI Log, 7 World Trade Center, July 1998 · Box 7DCAS

NYC-WTC_000173770

Request for Information log for 7 World Trade Center project tracking 24 RFIs with responses regarding return air duct and corridor construction design.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.920

machine-extracted · confidence unavailable · Check page ↗
RFI log for 7 WTC EOC project, September 1998 · Box 7DCAS

NYC-WTC_000173623

Request for Information log tracking queries and responses regarding wall offsets and wet columns at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.918

machine-extracted · confidence unavailable · Check page ↗
RFI log entries, Sep 1998 · Box 7DCAS

NYC-WTC_000166759

Log entries recording specific requests for information regarding air ducts and wet columns at 7 World Trade Center in September 1998.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.915

machine-extracted · confidence unavailable · Check page ↗
RFI log for 7 WTC EOC project, July-August 1998 · Box 7DCAS

NYC-WTC_000173590

Request for Information log documenting responses to queries about wall offsets and dimensions at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.913

machine-extracted · confidence unavailable · Check page ↗
RFI Log for 7 World Trade Center, July 1998 · Box 7DCAS

NYC-WTC_000173795

Request for Information log documenting RFIs regarding HVAC duct offsets and wet columns at the Mayor's Office of Emergency Management site.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.900

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

RFI log entries, Sep 1998 · Box 7DCAS

NYC-WTC_000166759

Log entries recording specific requests for information regarding air ducts and wet columns at 7 World Trade Center in September 1998.