NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/OEM Budget Accounting®Breakdown of Approved Change Orders
Document / 1 page

OEM breakdown of approved change orders, Nov 1998

Machine-extracted title · confidence 90%

Itemized list of approved change orders for the Mayor's Office of Emergency Management at 7 World Trade Center, including costs and approval dates.

NYC-WTC_000173550

Folder label: “OEM Budget Accounting®Breakdown of Approved Change Orders

Page image
Scanned page image, NYC-WTC_000173550
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

.■*r OEM Budget accounting

Mayor's Office of Emergency Management 7 Worid Trade Center i November 24, 1998

Breakdown of approved Change Orders -1—

Description of work Amount of Approval Amount proposal date approved Remarks

1 Moving wall/relocate ductwork $10,817.00i 8/11/98 $7,000.00 Approved 2 Baltimore Air Coil circuit cooling $9,818.00 $0.00 void 3R Miscellaneous electrical changes $3,704.00 9/14/98 $3,704.00, Approved 4R Bulletin #1 1. Cost relating to incorporating comments of port authority -$2,950.00 9/14/98 -$18,308.00 Approved 2. Cost for deletion of A/V works and equipments -$270,024.00 9/14/98 -$289,803.00 Approved 3. Hurricane wall a) Construction of hurricane wall $331,310.00 9/14/98 $281,112.00 Approved b) Motorize hurricane wall dampers $135,906.00 9/14/98 $126,000.00 Approved 5 void void 6 Additional cost approved for changing door #01A to bullet resistant $406.00 9/21/98 $406.00 Approved 7R void $0.00 $0.00 void 8 Additional cost approved for changing door #01B and surrounding area to bullet resistant $11,688 00 9/21/98 $11,688,001 Approved 9 Additional cost approved for changing d^oor finish from painted to Mahore finish $11,707,00 9/21/98 $11,707.00 Approved 10 Additional cost approved for providing class I package_______________ receiver as per sketch prepared by SHCA $2,666.00 9/21/98 $2,666.00 Approved Additional amount approved for revision of drawings with respect to the above referred door/package receiver $1,975.00 9/21/98 $1,975.00 Approved 11 Change door #5 from HM to ACME partition door $2,898.00 10/22/98 $2,898.00 Approved 12 Provide Volt meter & ammeter $7,766.00 10/30/98 $7,766.00 Approved 13 Additional framing/sheetrock at door frames & fascia $985.00 10/30/98 $985.00 Approved 14 Credit tor deletion of witnessing of field test for emergency generator by Cosentini Associates -$5,216.00 10/22/981 -$5,216.00 Approved 15 Additional 4" & 2" sleeves, 4" stub-up and associated cutting__________ and patching on 23rd floor $21,234.00 10/22/98' $21,234.00 Approved X Additional architectural fee for scope revisions $2,375.00 $21,519.00 to be approved 16R Changes in Panel boards $18,500.00 offered 17R F&l combination floor boxes under raised floor area as per architect $5,042.00 10/22/98 $5,042.00 Approved Additional fee for SHCA for revision to drawing for Microwave dish location $2,525.00 10/22/98 $2,525.00 Approved 18 Replace projectors with upgraded projeciors $16,761.00 $0.00 VOID 19 42" X 30" decoustic panels $4,636.00 10/30/98 $4,636.00 Approved 20 Provide power for fan power boxes from various panels lieu of one panel $12,866.00 10/30/98 $11,000.00 Approved 21 Additional structural steel at switch gear area and water tank $20,342.00 10/30/98 $18,500.00 Approved 22R F&l (2) 6 strand and (1) 24 strand multi-mode fiber_____________________________ $6,728.00 $6,728.00 to be approved X 23 Additional work on 7th floor as per sketch from Cantor $7,534.00 to be reviewed 24 Control wiring to 60 monitors & 4 LCD video projectors in EOC & Watch Command $3,001.00 $3,001.00 to be approved 25 Structural support for Microwave dishes $36,199.00 $34,500.00 offered X 26 Additional work as per SHCA sketches FSK-37, 38, 12 & 40 27 Credit for painting LAN room floor in lieu of VCT flooring________________________ $12,599.00 -$481.00 $0.00 to be reviewed VOID 28 Independent feed to ELP-23N & ELP-23N-1 $1,478.00 $1,478.00 to be approved ■V 29 Additional 2 duplex outlets and 1 switch in PDU/Training room #23-42____________ $464.00 $464.00 to be approved 30 Additional cost as per sketches FSK-47 & 41 $1,391.00 $1,391.00 to be approved X 31 F&l security wire in conduit as per VIkonIcs spec #11020-c______________________ 32 New coat closet as per FSK44 at room #23-09 $54,354.00 $6,694.00 to be reviewed $0.00 VOID 33 Additional cost for sleeves and grounding $5,008.00 $4,203.00 offered 34 F&l new metal cap flashing w/drip return as shown on the Kemper system drawing $1,391.00 to be reviewed

Total $497,116.00 $277,782.00

XtoTAu '"^5,000- Page 1

NYC-WTC_000173550

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173550Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

OEM budget breakdown for 7 WTC project, November 1998 · Box 7DCAS

NYC-WTC_000173554

Budget accounting document detailing construction costs, revised budgets, and change order approvals for the Mayor's Office of Emergency Management at 7 World Trade Center.

4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.977

machine-extracted · confidence unavailable · Check page ↗
OEM breakdown of approved change orders, Nov 1998 · Box 7DCAS

NYC-WTC_000173552

Itemized list of approved change orders for the Mayor's Office of Emergency Management at 7 World Trade Center, including costs and approval dates.

4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.960

machine-extracted · confidence unavailable · Check page ↗
Breakdown of approved work costs, MOEM, July 1999 · Box 7DCAS

NYC-WTC_000172947

Document dated July 12, 1999 listing approved change orders and costs for construction work at the Mayor's Office of Emergency Management in 7 World Trade Center.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.957

machine-extracted · confidence unavailable · Check page ↗
MOEM approved work breakdown, June 1999 · Box 7DCAS

NYC-WTC_000172970

Document listing approved costs for ductwork, electrical changes, and hurricane wall construction at the Mayor's Office of Emergency Management.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.955

machine-extracted · confidence unavailable · Check page ↗
Breakdown of approved construction costs, April 2002 · Box 7DCAS

NYC-WTC_000171286

Document dated April 12, 2002 listing approved costs for various construction items including wall relocation and hurricane wall work at the Mayor's Office of Emergency Management.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.946

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →