NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Office of Emergency Management 7 World Trade Center
Document / 2 pages

Change order cost summary, 7 World Trade Center, July 1998

Machine-extracted title · confidence 95%

Memo from DCAS requesting revised cost proposals for change orders and A/V work clarifications at the 7 WTC project.

NYC-WTC_000173440–000173441

Folder label: “Office of Emergency Management 7 World Trade Center

Page image
Scanned page image, NYC-WTC_000173441
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document 09-0198. 18:33 FAX 2122100236 ___ |. $WANKE HAYDEN CONNELL.) ee awe es 902 2 OG , 18538. Ue aan. AV Equipment Elimination-——— 1, RF Distribution systam---=. ¢ Eliminate 13° monitors in the EOC area and the accompanying switching devices. All cabling for tho dovicos will remain.* 2. Prose Foedg--—-——- e The Press AV feed, within the Emergency Operations Room (from the EOC to the press room), should be downgraded from providing service for multiple cameras (6 providing service for ane camera. e ©The press AV feed from the press room to strect level should bs downgraded to a singlo feed so that the prass can have 2 pooled feed at the street; level. 3. External Video Foeds-oma-- ; ® Eliminate all cabling and switches which were importing external agency camera feeds (0.g. DOT, NYPD,eto.)* * Architectural impacts should be considered such as covering the 13” monitor furniture cuts with plates. Also the square footage of floor space in the head-end room should be kept for future expansion. Electrical outlets in the hoad-end ream, which were slated for AV equipment, thould alse be kept. NYC-WTC_0001 73441

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173441Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Value engineering memo, 7 WTC, September 1998 · Box 7DCAS

NYC-WTC_000168679

Architectural transmittal of value engineering comparison between construction change orders for 7 World Trade Center Mayor's Office emergency management space.

2 shared non-person entities · Same agency, volume and box · similarity 0.987

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →