Memo regarding revised change orders #3 and #4, July 1998

Machine-extracted title · confidence 95%

Memorandum summarizing costs for revised change orders submitted for the Mayor's Office of Emergency Management project at 7 WTC.

NYC-WTC_000172093–000172094

Folder label: “Office of Emergency Management®7 World Trade Center

Page image
Scanned page image, NYC-WTC_000172094
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document ud OL 98,18, 3% Fak 2122,09238 "3 1 SWANRE BAYDEN CONNELL UU we ve 902 » “a. AV Equipment Elimination——— 1. RF Distribution systom-~=. ¢ Eliminate 13" monitors in the EOC area and the scoompanying switching devices. All cabling for tho dovicos will remain.” 2. Prost Peeds--~——- e The Press AV feed, within the Emergency Operations Room (from the EOC to the press room), should be downgraded from providing service far multiple cameras 1o providing service for ane camera. e The press AV feed fram the press room to streot Ievel should be downgraded to a single fead so that the press can have s pooled feed at the street level. 3. Extemnal Video Foeds-—-=- ; ® Eliminate el] cabling and switches which were importing external agency camera feeds (0.g. DOT, NYPD,etc.)* * Architectural impacts chould be canaidered such as covering the 13” monitor furniture cuta with plates. Also the square footugo of floor space in the bead-ead room should be kept for future expansion. Electrical outlets in the hoed-and room, which were slated for AV equipment, should alse be kept. NYC-WTC_000172094

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172094Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Value engineering memo, 7 WTC, September 1998 · Box 7DCAS

NYC-WTC_000168679

Architectural transmittal of value engineering comparison between construction change orders for 7 World Trade Center Mayor's Office emergency management space.

3 shared non-person entities · Same agency, volume and box · similarity 0.980

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →