AMBASSADOR CONSTRUCTION CO. INC
Mayor’s Office of Emergency Management
7 World Trade Center -1 st. 7th and 23rd Floors
June 23. 1998
5 Page Two...
2.2 Replace all bullet proof doors with standard doors. This
credit includes removal of all wall bulletproofing and bullet
proofing of the lower portion of the Acme partitions y
Deduct $125,771.00
' .• ... ,
3. Eliminate the folding wall partitions at Rooms 34-44,45
and 46. Replace with Type 2 partitio.n walls, 9 Deduct
-------- ---------------ic.
4. Eliminate Overly safe door. Deduct $4,786.00 > I 3
6 As-pcs^ke Aliotta of Swanke, Hayden and Connell, this
changscOneists of constructing the hurricane walls of
the same fram shown on Detail 1 on drawings D-7.
The profile of these walfsj^l be the same as partition
types shown on the drawings?^ 1 bulletproofing has been
eliminated but shielding and trai will remain. All
blast proof doors end access doors will e'fuiTiished and
installed as per Swanke's fax message of 5/27/W>^^
electric operated dampers will also be furnished and ihstell^
as per same letter. This proposal supersedes the hurricar^^
wall txjdget of $473,870 previously submitted ( Add $167,252.00
In the event that bulletproo luincanc walk-Add $188,934.00
IniHe event that manual dampers are installed in lieu of
electrically operated dampers. Deduct $45,205.00
All the additions and deletions above include 8% General Conditions, 6% Overhead & Fee
and 1.26% Insurance.
Forward.../