1 Work Specified Lowest Bidder Cost 2nd Bidder cost 3rd Bidder Cost
190 36.Safe Door Overly Door 4,130
191 One Bid
192
193 1
194 i—
195 37. Rolling Fire Do Metro Door 2,892 Lombardi Door ’• 3,384 steel master 3,725
196 bid 6/9 no longer lowest bidder b/d 6/8
197
198
199
200 _______ _ !
201 38. Cut & Patch Ambassador Constili 30,000
202 One Bid
203
204
205
206 39.Generator Test Ambas^dor Const 4,500
.I
207
208
209
210
211 40. Wire Mesh Part Acorn 3,250 Newark 3,876 Feinstein Iron 7,500
212 b!d6/8
213
214 41. Hurricane wall not substantiated 473870
215
216
217 total 10,076,888
218 General Condition 8% 806,151 subtotal $10,883,039
219 Overhead Fee 6% 652,982 subtotal $11,536,021
220 Insurance 1.25% 144,200 subtotal $11,680,221
221
222 Total $11,680,221
223 i Is the rigging done by Ambassador? Where is Motorola contract or bid for the equipments on the roof and UPS?
224 L____ i i
225 Items in Itallic depict bid received after June 4/98.
226 Flag Items J T
227
228
229
230
7 World Trade Center-Bidder List Page 5 6/12/98 2:55 PM