Price Revision Memo for OEM Construction Project, July 1998

Machine-extracted title · confidence 95%

Memorandum detailing a cost increase of $117,684 due to design substitution for the Mayor's Office of Emergency Management construction project.

NYC-WTC_000172998–000173001

Folder label: “Hurricane Wall price revision

Page image
Scanned page image, NYC-WTC_000173000
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Sheet2

Notes:

In April (4/7/98) construction documents were 100% complete. At that time OEM for the first time requested a category 4 Hurricaine Wall. On 5/26/98 Swanke Hayden, the architects, prepared a Hurricaine Wall conceptional drawing. Silverstein approved this conception drawing on 6/1/98. (Had the Hurricaine Wall concept not been introduced at the completion of the Construction Documents, construction would have probably commenced by early June 1998.)

Page 1

NYC-WTC_000173000

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173000Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000173010 · Box 7DCAS

Memorandum detailing a cost increase of $117,684 due to design substitution for the Mayor's Office of Emergency Management construction project.

Filed in the same folder

Compare copies and versions →