NYC 9/11 Public Portal Document
Ace Audiovisual
Explanation Of Non-equipment Costs
A. Engineerin^/Project management
Includes jobsite meeting, field visits and inspection, preparation of all schematic drawings block
diagrams and as-built drawings. Overall supervision and scheduling of equipment procurement,
drawings, fabrication, delivery and training.
B. Drafting
Includes all required detailed AutoCAD drawings; electrical riser diagram, facilities plan, block
diagram, transmittals and documentation drawing package.
C. Assembly and Wiring
Includes all in house fabrication, equipment testing and modifications, subassembly, wiring and
testing.
D. Installation
Includes coordination at job site with client and electrical contractor, supervision of electrical
contractor for installation of wall plates and other AV related products. Cable pulls, installations of
equipment, testing and checkout.
E. General and Administration
Includes all G&A expenses, freight and shipping costs, shipping complete systems to job site and
insurance’s.
ACE AUDIOVISUAL 5
33-49 55*^ STREET
WOODSIDE, NY 11377
718-458-3800
FAX 718-899-1995