Date: May 18, 1998
Title: The Mayor’s Office of Emergency
Management’s EOC Workstations @
Seven World Trade, NY, NY
Reference: P2353B
Product: The MettWERK STATION
Page: ssxssss==
2 of 3
LEAD TIMES
Six Weeks From Approved Shop Drawings
Five Days for Shop Drawing Preparation
PRICING QUOTATIONS
EOC Workstations Per Enclosed Proposal No. P2353B:
Price per station (F.O.B. Fairfield, NJ): (74 required): $3,527.15 each station
(Including lighting fixture & base)
Podium Assembly: $2,000.00 total
Total Fillers. End & Back Panels: $5,937.70 total
Total Delivered & Installed $301,199.62
Please submit tax exempt form if applicable.
Delivery and installation includes:
On site Principal in Charge Project Management throughout project planning stage.
On site coordination with concerned parties and trades.
On site floor marking of all power and signal termination locations.
Two phase 608 local O.T. site deliveries
Two phase 608 local regular time installation
Total end & back panels: 8 double sided
6 63”H finished back panels
12 single sided
For more information about the proposed trading desk system, please refer to
LaCOUR Proposal No. P2353B.