19 TD-Custom Custom Trading Desk Monitor Enclosure Millwork 74
with finishes to match trading desks
20 TD-Custom Upgrade to Vcnccr or HPL Finishes, End Gable I
Detailing
Sab-total of Materials and Labor (A) $244,726.00
ADD FOR PROJECT LOGISTICS
(B) Packing & Shipping Preparation 4,240.00
(C) Freight: Cartage & Off-Loading (3 Dedicated Trailers - subject to confirmation) 19,500.00
(D) Engineering / Shop Drawings 3,995.00
(E) Installation (Union) Subject To Site Survey 28,039.00
Sub-ToUl (A) - (E) (F) 300,500.00
Total " DDP New York, NY." in US Dollars, aU Taxes Excluded $300,500.00
INCO Terms 1990 The Above Total is Based on A Ship Date of August 15,1998
ALL FINISHES TO BE APPROVED BY THE CLIENT PRIOR TO MANUFACTURING
Baked Enamel for Metal - to match Pittsburg Paint Black Magic 518-7-LRV: 4 Section B-273
High Pressure Laminate - Nevamar Neutra Matrix MR-2-3T
High Pres.sure Laminate - Nevamar Bronze Matrix MR-2-7T
Optional Operator Features
21 TD-UKBD Undercounter Keyboar J Drawer (20 3/8" clear Inside) 188.00 each
22 TD-AKBD Articulating Keyboard Drawer 298,00 each
23 TD-BS-B-24 Nominal 24" Binder Storage / Blank Kit 205.00 each
24 TD-BPL-TS Blank Panel Kit with Telephone Shelf 179.00 each
NOTES:
The following standard itains and conditions apply tu. and ate incorporated into, and os part of lire attached quotation ("Quclalion") provided by
Evans Consoles Incorporated (Evans Consoles) to the purchaser (the "Clieni”) of the materials and/or services.
1.0 Unit prices for the materials in the Quotation are valid for a period of 90 days, provided that the Client issues or confirms a pureha.se order in sufficient
time to enable Evans Consoles to source iind assemble materials to ensure that the delivery of the materials are complcie within 12 months of the date
of the Quotation. Evans Consoles reserviK the right to revise pricing on orders unfulfilled within such twelve-month period.
2.0 Upon the receipt of an order for the materials listed in the Quotation, Evans Consoles will establish a formal project schedule to ensure a timely delivery
of materials to the project site. The project schedule will (as a nunimum) Ic comprised of the following activity duration's and milestones.
Weelcs Cumulative Weeks
Pieparjtion of the Client Approval Drawings T 5 ■