NYC 9/11 Public Portal Document
AUG 02 1999 11:16 FR RnSASSADOR CON. TO SPI 7 WTC P.02/02
• ..aB—BWWgyarSy" CM] 35?iNJLASfiOCIATJSS IfiDDS
-•J
ASSOCTATrSLli ■ TWO rENN.TWZA, MEW YORK, MY Mill ■ 21M1S.3«OO ■ FAX211^W7M
JOB ORANDLM
TO: JoeAlrotta SUBJECT: [email protected].
ECgOVE
FROM*. RonPincott D AUG 2 1999 JOB NO; 1854
CC: M-Maybaui
J. Dwyer DATE: July 6,1999
V, Lemeshev.
RB: 7d> Flow Domestic Booster Systran Bearing Drips
We have reviewed toe domestic watar booster system located on the 7th floor wth die stqiplier
ofthesystem. The jimnp provided has beatingsthat ate water cooled. This discharge is very
limited in flow. To eliminate the problem of getting rid of this water, we propose the use of an
automatic pump and collection tank unit This unit will be installed adjacent to the pomp
package and will sit on the waterproofed floor.
The pump unit shall be:
• Federal Pump Corporation model AITV automatic unit
• Heavy duty lO gallon
• Pump: 1/3 Kp. 1750 RPM
-Single phase 60 eye. US volt with cord and plug
-20 GPM -10 ft. hd.
*2" inlet - 1" discharge
Provide 2” trap and iumwl on tide inlet for psoposed LW. fiom bearing seals of doroeetic pump
system. Connect pump disc^targe p^ to tK exxstmg anop pump diacharga pipe at the eotridor
wall Provide check vidve and riratoff valve in discharge piping.
A120V 30 amp receptacle shall Im provided at toe loeatioo ofthe new pomp for plug in
connection. This shall be coordinated with toe electrical contractor.
We era reviewing die building alternate to toe self contained pEunp and tank unit.
XAWFFltBSVlISAAWCMOTOSMOl
JU. 0f? *99 10547
21221902% PAGE. 02
** TOTAL PAGE.02 **
NYC-WTC_000172580
OCR can misread numbers and units. Confirm readings against the page image before using them.