NYC 9/11 Public Portal Document
18:31 FAX 2122190256 SWANKE HAYDEN CONNELL
07;04 FAX 212 615 3700 COSENTINI ASSOCIATES 0002
zSENTINI ASSOCIATES LLP ■ TWO PENN. PLAZA, NEW YORK, NY 10121 ■ 212-615-3600 ■ FAX 212-615-3700
JOB MEMORANDUM
TO: Joe Alrotta SUBJECT: [email protected].
FROM: Ron Pincott
JOB NO: 1854
CC: M. Maybaum
J. Dwyer DATE: July 6,1999
V. Lemeshev
RE; 7th Floor Domestic Booster System Bearing Drips
We have reviewed the domestic water booster system located on the 7th floor with (he supplier
of the system. The pump provided has bearings that are water cooled. This discharge is very
limited in flow. To eliminate the problem of getting rid of this water, we propose (he use of an
automatic pump and collection tank unit. This unit will be installed adjacent to the pump
package and will sit on the waterproofed floor.
The pump unit shall be:
• Federal Pump Corporation model AITV automatic unit
• Heavy duty 10 gallon tank
• Pump; 1/3 h-p. 1750 RPM
-Single phase 60 eye. 115 volt with cord and plug
-20 GPM - 10 ft. hd.
-2" inlet - 1" discharge
Provide 2" trap and funnel on tank inlet for proposed I.W. from bearing seals of domestic pump
system. Connect pump discharge pipe to the existing sump pump discharge pipe at the corridor
wall. Provide check valve and shutoff valve in discharge piping.
A 120V 30 amp receptacle shall be provided at die location of the new pump for plug in
connection. This shall be coordinated with the electrical contractor.
We are reviewing the building alternate to the self contained plump and tank unit.
X:\WI»U’ILES\l854.99\Rl’CM0706.M01
JUL 07 ’99 18 ••47
2122190256 PAGE,02
NYC-WTC_000172160
OCR can misread numbers and units. Confirm readings against the page image before using them.