Work authorization form, Ambassador Construction, March 1999 · Box 7DCASNYC-WTC_000168450
Work authorization and invoice form from Ambassador Construction requesting payment for additional labor and materials at a job site.
Same agency, volume and box · similarity 0.930
Work order authorization for additional labor and materials, Apr 1999 · Box 7DCASNYC-WTC_000171662
Authorization document requesting additional work with time and material billing terms at a specified job location.
Same agency, volume and box · similarity 0.923
Work order authorization for additional labor and materials, Apr 1999 · Box 7DCASNYC-WTC_000171664
Authorization document requesting additional work with time and material billing terms at a specified job location.
Same agency, volume and box · similarity 0.919
RBS Order #28516 for additional work, 7 WTC, Apr 1999 · Box 7DCASNYC-WTC_000171659
RBS Order #28516 authorizing additional work at 7 World Trade Center dated April 8, 1999.
Same agency, volume and box · similarity 0.901
Work order authorization for additional work, Oct 1998 · Box 7DCASNYC-WTC_000171394
Authorization document requesting additional labor and material work at a specified location with net 15 day payment terms.
Same agency, volume and box · similarity 0.899
Change Order #15 sleeves, 7 WTC, Oct 1998 · Box 7DCASNYC-WTC_000168650
Change Order #15 submitted by Ambassador Construction for sleeve installation at the 23rd floor of 7 World Trade Center dated October 8, 1998.
1 shared topics · Same agency, volume and box · similarity 0.883
Change Order #61 for auxiliary wire installation, 7 WTC, Jan · Box 7DCASNYC-WTC_000171410
Ambassador Construction submits Change Order #61 to run wires from auxiliary contacts to magnetic locks at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.883
Revised change order #044R for fuel lines, 7 WTC, March · Box 7DCASNYC-WTC_000171758
Revised change order from Ambassador Construction Company detailing costs and scope for supporting and encasing fuel oil lines at the Mayor's Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.883
RFI and fax log records, 1995 · Box 7DCASNYC-WTC_000166710
Log entries recording received faxes and requests for information related to the 7 World Trade Center project in 1995.
1 shared topics · Same agency, volume and box · similarity 0.881
Work order #27818 for additional electrical work, Nov 1998 · Box 7DCASNYC-WTC_000171957
Work order authorizing additional electrical work at the 7 World Trade Center on a cost-plus basis.
Same agency, volume and box · similarity 0.881
Change order for electrical riser installation, 7 World Trade Center, · Box 7DCASNYC-WTC_000171626
Proposal to install galvanized conduit and fiber optic cables between the loading dock and 23rd floor LAN room for $45,000.
1 shared topics · Same agency, volume and box · similarity 0.880
Electrical estimate for fuel oil piping support at 7 WTC, · Box 7DCASNYC-WTC_000171752
Estimate for providing demolition, temporary lighting, and power required for fuel oil piping work on the first floor of 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.880