Mayor's Office of Emergency Management 7 World Trade Center Change Order #044R Amb. Job #S57-5175

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000171758–000171761
Page image
Scanned page image, NYC-WTC_000171760
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

APR 06 ’99 11:02 PR AMBASSADOR CONSTR. C0212 949 9762 Ip 669^640 P.08/08 « V r 5^ V az 4.

SWAIKE HaTIEI CeilELL AReHITEeTS

1'-r 16 GA. STRAPS 4-0" O.C. (2" WIDE) 4^ I 4 </ 10 GA. METAL ENCLOSURE WELDED TO 4' 'steel CHANNEL FILL ENCLOSURE W/ CONCRETE W/ MIN. 6” 4 OF CONCRETE ON ALL SIDES OF CONDUIT so 4 QPf 4 8" < FUEL CONDUIT

K-I-AO SHIM AS REQ'D I

w» I STEEL CRADLE WELDED EVERY 4-0" O.C,

d 4 4 !

' - C15X50

10" X 10" X 3/8" BEARING PLATE 1/4*0 BOLTS (4) EXIST. 8" CMU. WALL

I -h 10GA. STEEL SIRAPING o gf + I I 2 5" X 5’ X 1/16* STEEL ANGLE I'-O" LOi MOUNTED W/ 2 EXP. BOLTS TO CMU 4*0 EXTRA STRONG PIPE WELDED TO BEARING PLATES TOP AND BOTTOM

Q i/2"0 EXP. BOLT HILTI OR EQUAL 12’ X 12" X 3/8” BE/tRING PLATE

Al

Ma. DbU Perisisu Jeb Tide Skelcb Number ^ = T-Q‘ 1 3-19-99 AS N9TE0 Mayors Office of Emeraency Management Drawing TiUc Dr««a By FUEL UNE ENCLOSURE__________ SPAN laaied SK-58 Job Mo. Smoke Hayden Cemell LU. 9/11/99 5676 A Swank* Hayden ConnaU 4 Partnen. LLP 0 im 3M1U Ui^ CMbM Jbtuiacti SaS Letayelte Sired. So York. Nev York 10012 Photic 212 SJ S53J. Pax 212 213 0053

MAR 13 1933 12--03 212219025S PAGE.02 ** TflTQI PQGF RR ** i NYC-WTC_000171760

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171760Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change order #044R for fuel oil line work, 7 WTC, · Box 7DCAS

NYC-WTC_000168439

Change order for $85,893 covering support structures, concrete encasement, routing, and patching for fuel oil lines and enclosures at 7 World Trade Center.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.973

machine-extracted · confidence unavailable · Check page ↗
Change Order #15 sleeves, 7 WTC, Oct 1998 · Box 7DCAS

NYC-WTC_000168650

Change Order #15 submitted by Ambassador Construction for sleeve installation at the 23rd floor of 7 World Trade Center dated October 8, 1998.

2 shared non-person entities · Same agency, volume and box · similarity 0.955

machine-extracted · confidence unavailable · Check page ↗
Change Order request #1 for OEM work, Jan 1999 · Box 7DCAS

NYC-WTC_000171459

Letter from Computer Floors Inc. dated January 28, 1999, requesting a change order for $4,750 regarding work at the Mayor's Office of Emergency Management.

1 shared non-person entities · Same agency, volume and box · similarity 0.949

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000171766 · Box 7DCAS

Cover letter submitting Change Order #44 for $24,307 to install fuel oil piping at 7 World Trade Center.

Similar indexed content

Compare copies and versions →