AUG 02 1999. 11:16 FR AMBASSADOR CON. TO SPI 7 UTC P.02/02
WTSySree*^ CMKT* JH1_AS5DCIAT«5 IfiDOZ
JOB MEMORANDUM
TO: Joe Alioto SUBJECT: O.RM. ©T.W.T.C.
yCEDVB
FROM: RonPincott
AUG 2 1999 JOB NO; 1854
CXJ: M-Maybaui
J.Dvryer DATE: July 6.1999
V. Lemeshe
RB: 7fli Floor Domestic Booster System Bearing Dnpi
We have reviewed Bib domestic water booster system located on the 7to floor with toe sxqjptior
oftoesystem. The jiumppnMded has bearingatoat arc water cooled. Tina discharge is very
limited in flow. To eliminate the problem of getting rid ofthis wate, we propose toe use of an
automatic pump and coUectianta^ unit This unit will he installed adjacentto the pomp
package and will ait on toe wateiproo&d floor.
The pump unit shall be:
• Federal Pun^ Corporation moddAlTV automatic unit
• Heavy duty lO gallont^
• PiW’-1/3 h.p. 1750 RPM
-Single phase 60 eye. 115 volt-with cord and plug
-20 GPM-10 ft. hd.
-2" inlet-1" discharge
Provide 2" trap and funnel on tank mlet for proposed LW. fiom bearing seats ofdomestic pmsp
system. Connect pump diBc^isr^ pipe to toe existing sunqj pump diadiargcp^ at the corridor
wall. Provide chock valve and sbnloflf valve In disduBTge piping.
A120V 30 anq> receptacle shall provided at toe location of toe new pump for plug in
connection. Thia shall be coordinated with toe electrical contractor.
We ate reviewing the building alternate to dw self K«itaincd plunqj and tank unit
x'swnrajBSktiMMwcanniaMDi
al 07 ‘99 18:47
2122X902^6 PAGE.02