Document / 1 page
Fax Estimate, Lock Out/Tag Out Services, May 2009 Machine-extracted title · confidence 75% Fax estimate for lock out and tag out services at 7 World Trade Center, floor unspecified.
NYC-WTC_000171484 Folder label: “7 WTC®Floor 23®lock out/tag out”
Save to case Cite this page ↗
More like this page Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000171969 · page 1 · Box 7DCAS Similarity score 0.944 (not a probability)
NYC-WTC_000173703 · page 1 · Box 7DCAS Similarity score 0.943 (not a probability)
A/V cost reduction offer, 7 World Trade Center, June 1998 · page 2 · Box 7DCAS NYC-WTC_000173419
Correspondence from ACE Audiovisual explaining price reductions for monitor elimination and clarifying switching device requirements.
Similarity score 0.943 (not a probability)
Change order for electrical riser installation, 7 World Trade Center, · page 2 · Box 7DCAS NYC-WTC_000171626
Proposal to install galvanized conduit and fiber optic cables between the loading dock and 23rd floor LAN room for $45,000.
Similarity score 0.942 (not a probability)
Asbestos fiber analysis report, 111 Fulton Street, July 2002 · page 3 · Box DEP Box 52 NYC-WTC_000128736
Laboratory report from ATC Associates dated July 24, 2002, detailing asbestos fiber analysis for 111 Fulton Street.
Similarity score 0.940 (not a probability)
Construction work estimate or quotation for 7 World Trade Center, · page 1 · Box 7DCAS NYC-WTC_000171490
Faxed estimate or work proposal from construction contractor regarding unspecified work at 7 World Trade Center with pricing and scope details.
Similarity score 0.940 (not a probability)