NYC-WTC_000171969
OEM memo regarding Ambassador and related space/lease matters.
1 shared topics · Same agency, volume and box · similarity 0.954
machine-extracted · confidence unavailable · Check page ↗Fax cover regarding architectural/construction services for OEM.
NYC-WTC_000173703Folder label: “OEM”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
•** -'OCT 26 ’98 14:33 PR PMBPSSPDOR CONSTR. C0212 949 9762 TO 6694107 P.03/05 ....... 4009 TO PnBASSPDCR P.01/02
ROBERT B. SAMUELS INC.
TO: COMPANY NAMS:
ATTENTION OF: £
FAX;
FROM: GAS.Y FISHBONE
FAX #: (212) 213-4089
TOTAL NUMBER OF PAGES inCLUDXNO CC'TER SHEET:
DATE:
RFPttRENCE: _________
T) ^7^
6osr
352 PARK AVENUE SOUTH/NEW YORK 10010/ 686-6700/FAX: 213-4089
97>: P.03 □CT-26-1998 14:29 212 949 9762
NYC-WTC_000173703
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000171969
OEM memo regarding Ambassador and related space/lease matters.
1 shared topics · Same agency, volume and box · similarity 0.954
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172675
Fax transmission header with sender/recipient details for May 1993.
1 shared topics · Same agency, volume and box · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172501
Addendum #1 to a construction cost estimate for the Mayor's Office of Emergency Management space at the World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.929
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172473
Addendum #1 to a construction cost estimate regarding electric fixtures for the Mayor's Office at the World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.918
machine-extracted · confidence unavailable · Check page ↗1 shared topics · Same agency, volume and box · similarity 0.918
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173419
Correspondence from ACE Audiovisual explaining price reductions for monitor elimination and clarifying switching device requirements.
1 shared topics · Same agency, volume and box · similarity 0.910
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171872
Internal memo summarizing net cost changes for shelving height modifications and unit additions at the Mayor's Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.909
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173980
A fax cover sheet from the Department of Citywide Administrative Services Bureau of Space dated January 14, 1999.
1 shared topics · Same agency, volume and box · similarity 0.908
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173038
Contractor explains that switching devices were retained despite monitor elimination to ensure equipment functionality.
Same agency, volume and box · similarity 0.907
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173144
A letter from ACE Audiovisual explaining price reductions for the removal of monitors at the Mayor's Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.904
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173027
ACE Audiovisual explains price reductions for eliminating monitors while retaining necessary switching devices.
Same agency, volume and box · similarity 0.904
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100942
March 2003 fax cover sheet regarding site cleanup activities at the World Trade Center.
Similar document embedding; no shared entity or topic indexed. · similarity 0.903
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000171969
OEM memo regarding Ambassador and related space/lease matters.
Similarity score 0.977 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172675
Fax transmission header with sender/recipient details for May 1993.
Similarity score 0.969 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172501
Addendum #1 to a construction cost estimate for the Mayor's Office of Emergency Management space at the World Trade Center.
Similarity score 0.964 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171626
Proposal to install galvanized conduit and fiber optic cables between the loading dock and 23rd floor LAN room for $45,000.
Similarity score 0.964 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172473
Addendum #1 to a construction cost estimate regarding electric fixtures for the Mayor's Office at the World Trade Center.
Similarity score 0.959 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.959 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Cover sheet for a fax from Cantor Seinuk Group regarding section and elevation drawings at 7 World Trade Center.
Filed in the same folder
Cover sheet for a fax from Cantor Seinuk Group regarding the Office of Emergency Management project.
Filed in the same folder
NYC-WTC_000166836
Correspondence from a consulting engineering firm to the Mayor's Office of Emergency Management regarding project specifications.
Filed in the same folder
NYC-WTC_000166873
Document containing technical specifications for equipment required by the Mayor's Office of Emergency Management.
Filed in the same folder
NYC-WTC_000167206
Change order proposal totaling $91,550 for hurricane wall designs and reimbursables for Mayor's Office of Emergency Management project.
Filed in the same folder